Eagan Civic Center Gymnasium Painting
City of Florissant — Parks and RecreationFlorissant, Missouri#25-0272-PR
The City of Florissant is seeking a painting contractor to repaint the gymnasium at the James J. Eagan Civic Center. Work includes painting the ceiling black, applying a base wall color, and installing three accent color stripes (two at 2 ft high, one at 3 ft high). The contractor must provide all labor, materials, equipment, and supervision. Work must be completed between January 18 and February 8, 2027. The contractor must coordinate with the Parks and Recreation Department, protect existing surfaces, and submit paint samples for approval. The project includes painting a 12 ft × 12 ft Parks & Recreation logo on the wall using matte or low-sheen finish. The contractor must verify all square footage prior to bidding. Site visits are available upon request.
On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 24, 2026, 2:00 PM CT
- Time stated in bid documents
- Nov 24, 2026, 2:00 PM Central Time
- Submission
- mail, hand delivery
Scope of work
- Apply base wall color throughout gym
- Protect gym floor, equipment, and fixtures during work
Steps to Bid
- 1
Submit all questions to the City of Florissant by the deadline specified in the solicitation. by Nov 24, 2026, 2:00 PM
- 2
Submit the completed bid package by the due date and time. by Nov 24, 2026, 2:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
238190, 238290
How to submit
Bids must be submitted in a sealed envelope marked 'Bid for 25-0272-PR - Eagan Civic Center Gymnasium Painting' and delivered to the City of Florissant, 1000 N. 14th St, Florissant, MO 63033. Electronic submissions are not accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
All work shall be completed in a professional and workmanlike manner, with appropriate preparation and protection of the gymnasium floor, equipment, fixtures, and other existing surfaces. Scope of Work A. Site Preparation and Protection: Inspect all surfaces to be painted and notify the City of any existing damage or conditions that may affect the finished product. Protect the gymnasium floor, basketball goals, bleachers, doors, windows, lights, vents, electrical fixtures, and other surfaces or equipment not designated for painting. Provide all necessary lifts, scaffolding, ladders, and other equipment required to safely access the ceiling and upper wall areas. Properly prepare all surfaces before painting, including cleaning, removing loose or peeling paint, and addressing minor surface imperfections. Mask and cover all adjacent surfaces to prevent paint overspray, splatter, or other damage. Prepare the ceiling surface to promote proper paint adhesion and a consistent finish. Apply a suitable primer where necessary based on the existing surface and condition. Apply the number of finish coats necessary to achieve uniform color, coverage, and appearance, following the paint manufacturer's recommendations. Protect or carefully work around existing lighting, ventilation systems, fire protection equipment, and other ceiling-mounted fixtures unless otherwise directed by the City. The City will be removing the drop ceiling prior to painting. C. Gymnasium Walls: Prepare all designated wall surfaces for painting. Apply three additional accent color stripes in locations and widths approved by the City of Florissant. Ensure the accent strips are straight, level, consistent in width, and cleanly defined, with sharp edges and no visible bleeding between colors. Apply sufficient coats to provide uniform coverage and a consistent finish across all designated surfaces. Wall colors will be chosen with the selected vendor. D. Paint and Materials: Provide all paint, primer, masking materials, drop cloths, and related supplies necessary to complete the project. Use commercial-grade paints appropriate for an indoor municipal gymnasium, including ceiling and wall surfaces. Provide durable, washable wall paint suitable for a high-traffic recreation facility. Submit proposed paint products, colors, finishes, and manufacturer specifications to the City for approval before purchasing materials or beginning work. The City will approve all final colors and the layout of the two accent stripes before application. Schedule and Coordination: The contractor shall complete all work within the following project period: Start Date: January 18, 2027; Final Cleanup and Inspection: Completed by February 5, 2027; Final Completion: February 8, 2027. The contractor must confirm access requirements, staging locations, work hours, and any facility restrictions with the City. The contractor shall provide a proposed work schedule identifying surface preparation, ceiling painting, wall painting, accent stripe application, drying time, cleanup, and final inspection. All work must be performed in a manner that allows the City to resume normal facility operations by the required completion date. Contractor Responsibilities: Furnish all labor, supervision, materials, equipment, tools, and transportation required for the project. Maintain a safe, orderly work area and comply with all applicable federal, state, and local safety requirements. Ensure employees are properly trained to operate lifts and other equipment used for the project. Provide 3/4 inch plywood for protection while driving lifts across the gymnasium flooring. Provide appropriate ventilation and follow all manufacturer requirements for application, drying, and curing. Prevent unauthorized access to the work area while painting or other hazardous operations are underway. Remove all masking materials, debris, empty containers, and other project-related waste upon completion. Repair or pay for damage caused by the contractor to City property, equipment, or existing finishes. Notify the City promptly of unforeseen conditions, delays, or additional work that may affect the schedule or project cost. Obtain written approval from the City before performing work outside the approved scope. Provide dumpster for all waste materials or remove debris from work area each day.
Key dates
- Bids due
- Nov 24, 2026, 2:00 PM CT
More from this agency
- Eagan Gymnasium Flooring Resurface — closes Nov 24, 2026
Similar open bids
- Tennis Court Repair and Maintenance — City of Springfield
- Outdoor Pool Painting at the Troy Aquatic Center — City of Troy
- Outdoor Pool Painting — City of Troy
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026