EARLINE L BRIDGES Classification Code 30301
Wisconsin Public Notice — StatewideWisconsin
Work includes replacement of Struvite Harvesting drying equipment, installation of a wet mill system and chemical dosage system, piping, electrical, instrumentation, controls, plumbing, and ancillary systems. All work is at 1610 Moorland Rd, Madison, WI 53713. Proposals must be submitted electronically via [link available with Pro] by 1:00 pm on December 3, 2026. A complaint related to the project is also being served.
On PublicBidSearch: the newspaper notice, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 3, 2026, 1:00 PM CT
- Time stated in bid documents
- Dec 3, 2026, 1:00 PM Central Time
- Submission
- online electronic bid service
- Documents analyzed
- 1
Steps to Bid
- 1
Submit a bid via the online electronic bid service through Official linkPro by 1:00 pm, Thursday, December 3, 2026
What you'll need
Contract duration
Not specified in the document
Submission
Online electronic bid service
NAICS
237130, 237190
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
All work is located at 1610 Moorland Rd, Madison, WI 53713, Dane County, Wisconsin. Proposals must be submitted via the online electronic bid service through [link available with Pro]. All prospective bidders, including mechanical and electrical subcontractors, must be qualified for this specific work. The complaint, which is also served on the plaintiff’s attorneys, states the nature and basis of the legal action.
Key dates
- Pre-bid meeting
- Nov 23, 2026, 11:00 AM Central Time
- Bids due
- Dec 3, 2026, 1:00 PM CT
Documents
- mni_wsjo_111226_01_b_009_00_01_zz_w-socr.pdf1 pages
More from this agency
- Lincoln Avenue Elementary School Demolition – Re-Bid II — closes Nov 20, 2026
- Request for Proposals: Security Systems and Services for St. Peter the Apostle Campus — closes Nov 24, 2026
- RFP for Safety & Security Enhancements at St. Peter the Apostle Campus — East Troy, WI — closes Nov 24, 2026
- HEALTH SERVICES LOAN TRUSTEE 2026 Curriculum — closes Dec 3, 2026
- Southside Interceptor Sewer Construction Contract 2 — closes Dec 3, 2026
Similar open bids
- Trail Bridge Replacement on Badger State Trail, Town of Monroe, WI — Department of Natural Resources
- Glen Park Swinging Bridge Rehabilitation — City of River Falls
- Highway Resurfacing and Bridge Rehabilitation on State Highway 14, Wisconsin — Wisconsin Department of Transportation
- Highway Resurfacing and Bridge Rehabilitation on State Highway 14, Wisconsin — Wisconsin Department of Transportation
Closing this week nearby
- BPA Call Order Exceeding $20,000 Synopsis 1175241 — closes Nov 18, 2026
- Good Shepherd Lutheran School: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (Existing Equipment) — closes Nov 18, 2026
- Pre-Construction Site Preparation – Time Restricted – Boys & Girls Club — closes Nov 18, 2026
- New Warehouse Construction at Prairie Du Chien Correctional Facility — closes Nov 19, 2026
- Maintenance Building Remodel Phase II — Roofing, Stucco, Window, and Fire Alarm System Rehabilitation — closes Nov 19, 2026