OpenConstructionCloses Nov 25, 2026, 4:30 PM CT

Electrical, Mechanical-HVAC, Plumbing, Roofing, and Special Instructions — Keota, Oklahoma (Work Order #170607)

Choctaw Nation Housing AuthorityKeota, Oklahoma#170607

Contractors must visit the site before bidding; change orders for overlooked site conditions will not be approved. Work must meet or exceed the 2019 IRC. The contractor is responsible for all permits, line locates, cleanup, and yard restoration. Roofing includes full tear-off and replacement with 40-year, 26-gauge painted metal roofing, proper flashing, ridge ventilation, and roof jacks. HVAC work requires a new 14.3 SEER2-rated heat pump, copper line-set, new electrical components, and AHRI certification submission. Plumbing includes dielectric union on propane line, frost-free exterior faucets, and pressure release drain. Electrical work includes new light fixture and detectors, with repair of all damage. Bids must be submitted electronically via the Housing Bid Board by 4:30 PM on November 25, 2026. The award is expected by December 25, 2026.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Nov 25, 2026, 4:30 PM CT
Time stated in bid documents
Nov 25, 2026, 4:30 PM Central Time
Submission
online portal
Documents analyzed
1
Required submission items
3 items · full checklist with Pro

Scope of work

  • Replace 40-year painted metal roofing with proper flashing and vented ridge cap
  • Install new 14.3 SEER2-rated electric heat pump HVAC system
  • Replace two exterior faucets with frost-free models
  • Repair all drywall, paint, and flooring damage from electrical work

Steps to Bid

  1. 1

    Visit the project site at 21053 E CR 1195, Keota, OK 74941, before submitting a bid

  2. 2

    Review all scope details, special instructions, and technical requirements

  3. 3

    Prepare a complete, itemized bid with valid price expiration date by Nov 25, 2026, 4:30 PM

  4. 4

    Submit the bid exclusively via the Housing Bid Board at Official linkPro by Nov 25, 2026, 4:30 PM

What you'll need

Submission

Online portal

NAICS

238290, 238990

How to submit

Bids must be submitted exclusively through the Housing Bid Board. No bids will be accepted via email, mail, or other means. Bids must be itemized and include a valid price expiration date. The bid form must be completed and submitted electronically via the portal.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Procurement of electrical, mechanical-HVAC, plumbing, and roofing services for a 3-bedroom, 2-bath brick home located at 21053 E CR 1195, Keota, Oklahoma, 74941. The home has a slab-on-grade foundation and a shingle roof. Work must meet or exceed the 2019 International Residential Code (IRC). All applicable contractor licenses must be held. Contractors are required to visit the project site prior to submitting a bid; change orders due to site conditions that could have been identified during a site visit will not be approved. The homeowner or property manager will select all colors used in the work. All material quantities and measurements must be determined by the contractor. Roofing scope includes removal of all shingles, felt, roof jacks, drip edge, and attic ventilations; repair or replacement of decking as needed; installation of new 40-year, 26-gauge painted metal roofing with 30# felt, drip edge (if required), rake, continuous ridge with vented closure strips at the peak for ventilation (may require cutting decking at peak), roof jacks, high-heat roof jacks for gas appliance penetrations, and minimum 1.5-inch screws. Ridge cap screws must be installed at every rib. Flashing must be used as needed for proper finish. Lathe roof installation if required. Contractor to select roofing color. All vent piping must be properly attached at the appliance upon roof completion. Mechanical-HVAC scope includes removal and replacement of the existing HVAC unit with a new minimum 14.3 SEER2-rated electric heat pump. Install new copper line-set, filter drier, thermostat, and registers. Replace all electrical components from the service line to the HVAC unit, including breaker boxes and breakers. Caulk all ceiling drops to drywall before register installation. Seal the return air cavity with drywall. Insulate ducts where needed. Replace the plenum if required for proper fitment. If duct board is used for transition to plenum, all joints must be foil-taped and sealed with acrylic latex or mastic sealant. Ductwork under the home must be insulated metal pipe; flex duct is prohibited. Contractor must properly size the new unit. AHRI certificate for equipment must be submitted with invoice for payment. Electrical scope includes removing and replacing the hall bathroom light fixture and installing new smoke and carbon monoxide detectors throughout the home. No bids will be accepted via email, mail, or other means. Bids must include an itemized cost breakdown and a valid price expiration date. The anticipated award date is December 25, 2026.

Key dates

Site visit
Nov 16, 2026
Bids due
Nov 25, 2026, 4:30 PM CT
Expected award
Dec 25, 2026

Documents

  • 2026-11-16__bid-170607--8-17-am.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby