OpenRFPCloses Dec 16, 2026

Electrical System Operations & Maintenance Services

Port of StocktonStockton, California#RFP-2026-0008

The work includes 24/7 emergency response, routine and preventive maintenance of 60 kV and 12.47 kV distribution systems, overhead and underground distribution work, switching and outage response, transformer and switchgear maintenance, commercial electrical work, street lighting, and maintenance of the Port-maintained Tantalus wireless revenue metering system (approximately 250 meters). The Contractor must provide qualified personnel, tools, equipment, and technical resources. A qualified Foreman or Troubleman must be on-site during normal business hours (7:00 a.m. – 3:00 p.m., Monday–Friday, excluding holidays), and 24/7 emergency availability is required. The contract is for an initial term of three (3) years with two (2) one-year extension options. The Contractor must comply with Cal/OSHA, CPUC General Orders 95, 128, 165, and 174, and NFPA 70E. The Contractor shall provide all electrician and lineworker tools, test equipment, vehicles, and personal protective equipment at its own cost. The Contractor shall not remove, dispose of, modify, relocate, salvage, or use Port-owned equipment outside Port work without written authorization.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 16, 2026
Time stated in bid documents
Dec 16, 2026, 3:00 PM Pacific Time
Submission
mail, hand delivery
Contract term
three (3) years + two, 1-year options
Documents analyzed
6 published · 5 analyzed

Steps to Bid

  1. 1

    Register with the Port of Stockton and obtain a valid C-10 California Electrical Contractor’s License. Verify eligibility through the California State License Board (CSLB) website.

  2. 2

    Attend the mandatory, in-person Pre-Proposal Conference and Site Visit on November 17, 2026, at 10:00 a.m. at the Port Administration Building, 315 Fyffe Avenue, Stockton, CA. Attendance is required to be eligible to bid. was Nov 17, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Mail, Hand delivery

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Contractor shall provide qualified personnel, tools, equipment, and technical resources to operate, inspect, maintain, test, troubleshoot, repair, and support improvements to the Port's electrical system. Work includes 60 kV substation maintenance (every other year), protective device testing, and emergency restoration. The Contractor shall maintain a documented inspection and preventive maintenance program, submit required reports and records, and comply with all applicable codes, standards, and safety requirements, including Cal/OSHA, CPUC General Orders 95, 128, 165, and 174, and NFPA 70E. The Contractor shall provide all electrician and lineworker tools, test equipment, vehicles, and personal protective equipment at its own cost.

Key dates

Questions due
Dec 2, 2026, 5:00 PM Pacific Time
Pre-bid meeting
Nov 17, 2026, 10:00 AM Pacific Time
Bids due
Dec 16, 2026

Documents

  • RFP_Electrical-System-OM.pdf30 pages
  • Appendix-A-Respondent-Questionnaire_OM.pdf2 pages
  • Appendix-B-Standard-Agreement-General-Services_OM.pdf
  • Appendix-C-TWIC-Info-Sheet_OM.pdf1 pages
  • Appendix-D-Rate-Fee-Schedule_OM.pdf14 pages
  • Appendix-E-Data-Operating-Documents_OM.pdf3 pages

See all documents · Download with Pro