Elm Point Road Stormwater – Final (100%) Design
Rutland Regional Planning CommissionRutland, Vermont#77298
Required deliverables include a final design report, a 10-year O&M plan, a draft access license or easement, and permit application materials. The project must be completed by November 30, 2027. Bidders must submit proposals via email by 7:00 PM EST on December 7, 2026. The selected firm will be responsible for managing, tracking, and reporting project results per Vermont DEC requirements.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 8, 2026
- Submission
- Documents analyzed
- 1
Scope of work
- Develop 100% final design for a rain garden/bioretention project at 45 Elm Point Road, Addison, VT
- Draft a 10-year Operation and Maintenance (O&M) Plan
- Prepare permit application materials (if applicable)
Steps to Bid
- 1
Review the RFP and attached Tri-Town Stormwater Project Scoping Study.
- 2
Submit a proposal via email to [email available with Pro] and [email available with Pro] by 7:00 PM EST on December 7, 2026. by Dec 7, 2026, 7:00 PM
- 3
Attend a site visit if interested (contact Hilary Solomon or Emily Friedman to schedule).
- 4
Wait for notification of award on December 11, 2026. by Dec 11, 2026
What you'll need
Contract duration
11/30/2027
Submission
NAICS
541330, 541610
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
The project site is a private residential property on a steep slope where stormwater runoff from surrounding upland areas and adjacent developed surfaces converges. A conceptual design was completed as part of the Tri-Town Stormwater Project Scoping Study.
Key dates
- Bids due
- Dec 8, 2026
- Expected award
- Dec 11, 2026
Documents
- ElmPointRFP.pdf16 pages
Similar open bids
- 2026 Volkswagen Environmental Mitigation Trust: Eligible Mitigation Actions — DEC - AIR QUALITY & CLIMATE DIVISION
- Wastewater Resource Recovery Facility Flood Protection Design — City of Montpelier
- Windham Bank Stabilization #CA0901 — Windham Regional Commission
- Subsurface Utility Engineering Services 2027 — Agency of Transportation - Contract Administration
- Notice Of Request For Statement Of Qualifications For Engineering Services In Swanton, Vt (Homestead Acres Cooperative) — Cooperative Development Institute
Closing this week nearby
- Cleaning, Lead Paint Removal, and Repainting of Eleven Bridges in Berlin, Waterbury, Colchester, and Highgate — closes Nov 20, 2026
- Installation of Culvert Liner in Existing Culvert with Channel Approach Slope Work — Windham, VT — closes Nov 20, 2026
- Bridgewater ER P23-1(424) — Precast Concrete Box Culvert Installation and Highway Work — closes Nov 20, 2026
- St. George-Williston STP PS26(7) – Highway Resurfacing and Improvements — closes Nov 20, 2026
- Replacement of Bridge #1 Over Cold Spring Brook on VT Route 67 in Shaftsbury, Including Roadway and Approach Work — closes Nov 20, 2026