Elverta YR 30 RFP 27 110 Cabling Infrastructure
Elverta Joint Elementary School DistrictElverta, California#27
Work must be completed by August 1, 2027. A bid bond is required. Proposals must be submitted in a sealed envelope with one original, two copies, and one digital copy (PDF on flash drive) to the Main Office by January 8, 2027, before 3:00 PM. A walk-through is scheduled for December 3, 2026, at 3:00 PM. Questions must be submitted by December 9, 2026, via email. The contract is contingent on E-rate funding approval and Board approval.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 9, 2027
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- single term contract for the specified service + annually for a total time of contract not to exceed five (5) consecutive fiscal years
- Documents analyzed
- 1
Scope of work
- Install 1,000 feet of single-mode fiber from MDF to IDF
- Supply and install surface mount boxes, keystone jacks, faceplates, and patch cords
- Install 24-port modular patch panels and J-hook supports
- Remove all existing wiring
- Polish, terminate, and test all fiber runs with LC connectors
- Reuse existing raceways, racks, cabinets, and pull boxes
Steps to Bid
- 1
Attend the walk-through on December 3, 2026, at 3:00 PM at the Main Office. by Dec 3, 2026, 3:00 PM
- 2
Submit all questions by December 9, 2026, at 3:00 PM via email to [email available with Pro]. by Dec 9, 2026, 3:00 PM
- 3
Prepare and submit the proposal package by January 8, 2027, before 3:00 PM.
- 4
Ensure the proposal includes one original, two copies, and one digital copy (PDF on flash drive) in a sealed envelope.
What you'll need
Contract duration
120 calendar days from substantial completion
Submission
Mail, Hand delivery
NAICS
541512, 541513
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The vendor must provide a 2-year workmanship warranty, test results in electronic format, and as-built VISIO files.
Key dates
- Questions due
- Dec 9, 2026, 3:00 PM Pacific Time
- Pre-bid meeting
- Dec 3, 2026, 3:00 PM Pacific Time
- Bids due
- Jan 9, 2027
Documents
- ElvertaYR30RFP27_110CablingInfrastructure.pdf26 pages
More from this agency
Similar bids near Elverta
- Request for Proposals (RFP) for UPS Equipment - Erate YR 2027 (YR30) · McClellan Park · closes Dec 11, 2026
- Request for Proposals (RFP) for Wireless Equipment - Erate YR 2027 · McClellan Park · closes Dec 11, 2026
- RFP 27-108 Switch Equipment · Carmichael · closes Dec 9, 2026
- Request for Proposals (RFP) for Switch Equipment - Erate YR 2027 (YR30) · McClellan Park · closes Dec 11, 2026
- Systems Furniture Design & Reconfiguration Services · Roseville · closes Dec 1, 2026
Closing soon near Elverta
- SHRA Website Accessibility, Hosting, and WordPress Support · Sacramento · closes Nov 30, 2026
- Carmichael DMV Parking Lot Repairs Services · Carmichael · closes Dec 2, 2026
- Distribution Transformers Request for Proposal · Sacramento · closes Dec 2, 2026
- Special Tax and Assessment District Administration · West Sacramento · closes Dec 2, 2026
- Legislative Advocacy Services · Sacramento · closes Dec 4, 2026