OpenRFPCloses Dec 10, 2026

Environmental Monitoring Services for the CSWMC, SSWMC and Transfer Stations

Delaware Solid Waste AuthorityDover, Kent, Delaware#S-26-940-CSSS

Services include monthly and quarterly sampling and analysis of leachates, surface waters, and groundwaters, stormwater basin inspections, and report preparation. on December 10, 2026. Bidders must be licensed to conduct business in Delaware and provide proof of engineering or geology licensure in Delaware. A non-mandatory pre-proposal meeting is scheduled for October 1, 2026.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 10, 2026
Submission
mail, hand delivery

Scope of work

  • Monthly leachate sampling and analysis at CSWMC and SSWMC
  • Quarterly leachate and groundwater sampling at CSWMC and SSWMC
  • Quarterly depth-to-water measurements and groundwater mapping
  • Annual groundwater sampling for indicator analytes

Steps to Bid

  1. 1

    Attend the pre-proposal meeting (optional)

    A non-mandatory pre-proposal meeting is scheduled for October 1, 2026, at 10:00 a.m. at the DSWA Administrative Office, 601 Energy Lane, Dover, DE 19901.

  2. 2

    Submit questions

    All inquiries must be directed to Andrew Schott or Simone George via email or phone. Contact information: [email available with Pro], [email available with Pro], 302-739-5361.

  3. 3

    Prepare the proposal

    The proposal must include four (4) hard copies and one (1) complete electronic copy in PDF format on a flash drive. The proposal must be sealed and marked with the notation 'Proposal Enclosed' if sent by mail or personal delivery. The proposal must include documentation of licensure to conduct business in Delaware and a copy of the Certificate of Authorization (COA) to practice engineering in Delaware from DAPE, or proof of licensure through the Delaware Board of Geologists.

What you'll need

Submission

Mail, Hand delivery

NAICS

541330

How to submit

Four (4) hard copies and one (1) complete electronic copy in PDF format on a flash drive. The proposal must be sealed and marked with the notation 'Proposal Enclosed' if sent by mail or personal delivery. Proposals delivered by any other method will be rejected.

In person/mail: Delaware Solid Waste Authority, 601 Energy Lane, Dover, DE 19901

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

S-26-940-CSSS. The services include but are not limited to: monthly collection and analysis of leachates from CSWMC and SSWMC; quarterly collection and analysis of leachates from the Area A/B Master Pump Station at CSWMC; quarterly collection and analysis of surface waters from CSWMC and SSWMC; quarterly collection of depth-to-water measurements in groundwater monitoring wells and observation wells at CSWMC and SSWMC, with subsequent mapping of groundwater elevations, flow directions, and horizontal/vertical gradients; quarterly collection and analysis of additional leachates from CSWMC and SSWMC; quarterly collection and analysis of groundwaters at CSWMC and SSWMC; quarterly inspection of stormwater basins and field analysis of stormwater discharging from outfalls at DSWA's Pine Tree Corners, Milford, and Route 5 Transfer Stations; semi-annual collection and analysis of additional leachates and groundwaters from CSWMC and SSWMC; annual collection and analysis of groundwater samples for specified indicator analytes; preparation of detailed reports and inspection forms for all activities; and collection, analysis, and reporting on additional samples including solids, liquids, and/or gases not described in the RFP. Proposals must be submitted in four (4) hard copies and one (1) complete electronic copy in PDF format on a flash drive. on Thursday, December 10, 2026. Proposals sent by mail or personal delivery must be enclosed in a separate envelope marked 'Proposal Enclosed' on the outside. Proposals delivered by any other method will be rejected. Proposers must submit proof of licensure to conduct business in Delaware and a copy of their Certificate of Authorization (COA) to practice engineering in Delaware from the Delaware Association of Professional Engineers (DAPE), or proof of licensure through the Delaware Board of Geologists. A non-mandatory pre-proposal meeting is scheduled for October 1, 2026, at 10:00 a.m. at the DSWA Administrative Office. Site visits are encouraged and may be arranged by contacting DSWA prior to the proposal opening. All inquiries must be directed to Andrew Schott or Simone George at the email addresses and phone numbers provided.

Key dates

Pre-bid meeting
Oct 1, 2026, 10:00 AM Eastern Time
Bids due
Dec 10, 2026

Documents

  • environmental-monitoring-services-for-the-cswmc-sswmc-and-transfer-stations
  • environmental-monitoring-services-for-the-cswmc-sswmc-and-transfer-stations

See all documents · Download with Pro

Similar open bids

Closing this week nearby