OpenIFBCloses Dec 17, 2026

ERU-1 Replacement at Silver Lake Regional Middle School

Silver Lake Regional School DistrictMassachusetts

The Silver Lake Regional School District is seeking quotes for the replacement of rooftop energy recovery unit 1 (ERU-1) serving the auditorium at Silver Lake Regional Middle School in Kingston, MA. The project requires a DCAMM-certified HVAC prime contractor. A pre-bid meeting and site inspection are scheduled for December 1, 2026, at 3:00 p.m. at the school. Bids must be submitted electronically via [link available with Pro] by December 17, 2026, at 2:00 p.m. The contractor must be currently certified by DCAMM as a prime HVAC contractor.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 17, 2026
Submission
electronic portal
Documents analyzed
1
Required submission items
3 items · full checklist with Pro

Steps to Bid

  1. 1

    Register on Official linkPro and access the bid documents. was Nov 25, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Attend the pre-bid conference and site inspection on December 1, 2026, at 3:00 p.m. at Silver Lake Middle School, 256 Pembroke Street, Kingston, MA 02364. by Dec 1, 2026, 3:00 PM

  3. 3

    Submit the completed bid electronically via Official linkPro by 2:00 p.m. on December 17, 2026.

What you'll need

Submission

Electronic portal

NAICS

238290, 238299

How to submit

Submit completed bid via Official linkPro. All documents must be uploaded in PDF format. No hard copies accepted.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project requires a prime HVAC contractor certified by the Division of Capital Asset Management and Maintenance (DCAMM). Plans and specifications are available starting November 25, 2026, at 2:00 p.m. via [link available with Pro].

Key dates

Pre-bid meeting
Dec 1, 2026, 3:00 PM Eastern Time
Site visit
Dec 1, 2026, 3:00 PM Eastern Time
Bids due
Dec 17, 2026

Documents

  • 2408.05_SLMS-ERU1_26-11-04_Local_Ad.docx

See all documents · Download with Pro

More from this agency

Similar bids in Massachusetts

Closing soon in Massachusetts