ClosedRFPClosed Nov 16, 2026

EV Charging Assessment & Feasibility Study

Lexington-Fayette Urban County GovernmentLexington, Kentucky#RFP-46-2026

Lexington-Fayette Urban County Government is seeking a consultant to conduct an EV Charging Assessment & Feasibility Study. The study will evaluate infrastructure needs, load capacity, equity outreach, and strategic implementation. Proposals must be submitted in one PDF. The consultant must define 'local employment' based on the home office location. The proposal must include a completed MWDBE Participation Form. The approach section is limited to three pages (one for vision/introduction). The project supports the City Council’s December timeline. The selected firm will coordinate with utilities and deliver actionable recommendations.

On PublicBidSearch: the original bid posting, 41 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 16, 2026
Submission
online
Documents analyzed
41 published · 3 analyzed

Scope of work

  • Perform load analysis and evaluate grid capacity with utility coordination
  • Develop system-wide planning assumptions, charging scenarios, and infrastructure recommendations

Steps to Bid

  1. 1

    Review the RFP and all attachments, including the Public Question & Answer document.

  2. 2

    Submit questions by 11/5/2026 at 12:00 PM (ET). was Nov 5, 2026, 12:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Prepare and submit the proposal in one PDF file by 11/16/2026 at 02:00 PM (ET).

  4. 4

    Ensure the proposal includes a completed MWDBE Participation Form (Attachment A, page 25).

  5. 5

    Confirm that the approach section (Proposal Requirements 6b) is limited to three pages, with the vision/introduction limited to one page.

What you'll need

Submission

Online

NAICS

541611

How to submit

Submit one PDF file containing the complete proposal. The proposal must include the completed MWDBE Participation Form (Attachment A, page 25). The approach section (Proposal Requirements 6b) must not exceed three pages, with the opening vision and introduction limited to one page. Only online submissions will be accepted. By submitting, the bidder certifies they are authorized to represent and bind their company and agree to all bid terms and conditions.

Get alerts for bids like this

New consulting bids in Kentucky

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The selected consultant will conduct a comprehensive evaluation of electric vehicle (EV) charging infrastructure needs across the county, including system-wide planning assumptions, charging scenarios, and infrastructure recommendations. The scope includes a high-level assessment of potential locations, technology options, and financial models. The consultant must submit a proposal in one PDF file. The proposal must include a completed MWDBE Participation Form (Attachment A, page 25) and must address all requirements in Proposal Requirements 6b, which limits the approach section to three pages (with the opening vision and introduction limited to one page). The selected firm will be responsible for coordinating with utilities and providing actionable recommendations.

Documents

  • Bid_Invitation.pdf3 pages
  • Bid_Invitation.pdf3 pages
  • Bid_Invitation.pdf3 pages
  • Bid_Invitation.pdf3 pages
  • Public_Question_Answer.PDF2 pages
  • Bid_Invitation.pdf3 pages
  • Public_Question_Answer.PDF2 pages
  • Bid_Invitation.pdf3 pages

33 more files

See all documents · Download with Pro