OpenIFBCloses Jan 7, 2027

Exterior Improvements - Phase 1 at Rockville Superior Court

Connecticut Judicial Branch — Purchasing ServicesHartford, Connecticut#02-2625

This project is for Exterior Improvements - Phase 1 at the Rockville Superior Court, 20 Park Street, Rockville, CT. The scope includes removal and replacement of expansion joints, repointing mortar joints, replacing sealant joints, and roof scupper repairs. To be eligible to bid, vendors must be registered under the State's Supplier Diversity/Set-Aside Program and be DAS prequalified. The contract is subject to state spending allocation goals and contract compliance requirements. A mandatory pre-bid conference is scheduled for November 13, 2026, at 10:00 AM.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 7, 2027
Time stated in bid documents
Jan 7, 2027, 11:30 AM Eastern Time
Submission
electronic portal
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Select repointing of deteriorated mortar joints.
  • Offsite disposal of all removed materials.

Steps to Bid

  1. 1

    Attend Mandatory Pre-Bid Conference was Nov 13, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    See page 20 for details.

  2. 2

    Submit questions by the questions deadline.

  3. 3

    Submit bid by the due date. by Jan 7, 2027, 11:30 AM

What you'll need

Prequalification

Required

Contract duration

ninety (90) days from issuance of a Purchase Order

Submission

Electronic portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The building is a 1990s era courthouse with brick veneer masonry over CMU backup walls and a steel frame. The roof is low-slope, built-up, applied to a concrete deck with metal coping assemblies. The north and east elevations feature aluminum windows in punched masonry openings. Work hours are limited to 7 a.m. to 5 p.m., Monday through Friday, with potential for weekend work from 9 a.m. to 4 a.m. The Owner will occupy the site during construction.

Key dates

Pre-bid meeting
Nov 13, 2026, 10:00 AM Eastern Time · Mandatory
Bids due
Jan 7, 2027

Documents

2 agency-portal links

See all documents · Download with Pro

More from this agency

Closing soon near Hartford