OpenServicesCloses Dec 10, 2026, 3:00 PM CT

Fairhope Cast Iron Replacement - Phase 3

City of FairhopeFairhope, Alabama#27-005-2026-GAS-005

The City of Fairhope is requesting responses from qualified vendors to construct approximately 38,232’ of 2” PE, and 506’ of 3/4” PE gas mains. Contractor will install new gas ¾” PE service lines from main to meter to serve approximately 480 existing gas customers and perform tie-ins for the new 2” and ¾” gas mains. Existing gas mains and existing gas service lines will be retired in place. The system will be designed and tested to operate at 60 PSIG. Contractor will also replace approximately 1,200 water meters and connect SmartPoint to each new water meter installation. The replaced water meter will be returned to the City of Fairhope with supporting documentation.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 10, 2026, 3:00 PM CT
Time stated in bid documents
Dec 10, 2026, 3:00 PM Central Time
Bid bond
5%
Performance bond
100%
Payment bond
50%
Submission
mail, hand delivery
Documents analyzed
1

Steps to Bid

What you'll need

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project scope includes installing gas system improvements and water meter replacements.

Key dates

Questions due
Dec 7, 2026, 11:00 AM Central Time
Pre-bid meeting
Dec 3, 2026, 2:00 PM Central Time
Bids due
Dec 10, 2026, 3:00 PM CT

Documents

  • Bid 27-005-2026-GAS-005 Cast Iron Replacement Phase 3.pdf65 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby