OpenRFPCloses Dec 4, 2026, 3:00 PM CT

Install Centralized Water Softener at FCI Oxford, Wisconsin

Federal Prison System / Bureau of Prisons — FAOGrand Marsh, Wisconsin#15BBNF26Q00000039c

The Federal Bureau of Prisons (FBOP) and the Federal Correctional Institution Oxford located at 350 Elk Avenue, Oxford, Wisconsin, intend to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire Institution. Awarded Contractor shall provide materials, labor, and equipment to remove existing water softeners, pipe through and install a new centralized water softener and all associated components. FCI Oxford currently has several commercial-grade water softeners which are failing to efficiently reduce water hardness and protect water systems, as well as connected equipment. The new centralized system should improve water quality, minimize calcium buildup, and extend the service life of plumbing infrastructure and appliances. The contractor would place a brine tank and softener to be installed at the water tower. Water would be treated right off the water main, therefore there would be no need for bagged salt to be brought in weekly.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 4, 2026, 3:00 PM CT

Key dates

Bids due
Dec 4, 2026, 3:00 PM CT

Documents

  • 15BBNF26Q00000039.pdf21 pages
  • Instructions_to_Offerors.pdf1 pages
  • Attachment_2_Wage_Determination_WI20250015.pdf
  • Attachment_3_Bid_Bond.pdf4 pages

See all documents · Download with Pro

Similar open bids

Closing this week nearby