OpenOtherCloses Aug 26, 2027

Retainer, Compressor Top

Defense Logistics Agency — DLA AVIATION OKLAHOMA CITYNationwide (Federal)#FD2030-27-00220

The Defense Logistics Agency is procuring retainer, compressor top parts (NSN: 2840-01-205-1303NZ). Bidders must adhere to strict technical data and first article testing requirements, with potential waivers available under specific conditions. The solicitation involves export-controlled technical data.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Aug 26, 2027
Time stated in bid documents
Aug 26, 2027, 4:00 PM
Submission
electronic portal
Documents analyzed
1
Required submission items
20 items · full checklist with Pro

Scope of work

  • Adhere to specific drawing and specification requirements.
  • Complete First Article Qualification Test Plan and Procedures.
  • Submit Test/Inspection Reports.
  • Comply with export control restrictions.

Steps to Bid

What you'll need

Prequalification

Not required

Submission

Electronic portal

NAICS

336412

How to submit

Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
  • The 20-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

NSN: 2840-01-205-1303NZ NOUN: RETAINER, COMPRESSOR TOP DRAWING: 4060054 EDL REVISION & DATE: 9 / 12 JAN 2026 MDC CODE: W9R IM NAME: WOOD, DONNA S This solicitation involves technical data whose export is restricted by the Arms Control Act (Title 22, U.S.C., Sec 2751 et seq.) and the Export Administration Act (50 U.S.C., Appendix 2410). First Article Requirements: - First Article Quantity: 3 units - 2 parts will be part of the production quantity. - 1 part will be in addition to the production quantity. - First Article testing is waived if the offeror is the prime contractor, Pratt & Whitney. - First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements. - FAT test plan and Reports are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format. - 1 First Article part will be destructively tested and condemned at the vendor's facility. Contract Data Requirements List (CDRL): - Data Item No. A001: First Article Qualification Test Plan and Procedures (DI-NDTI-81307A) - Data Item No. A002: Test/Inspection Report (DID DI-NDTI-80809B) - Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format. - The first article test plan shall be received 30 calendar days from the date of contract. - Contractor will include any QAR findings relative to the test report with the final test report submitted to AFLCMC/LZPED. Coordinators: AFLCMC/LZPED 3001 Staff Dr, Ste 1AF1 105A Tinker AFB, OK 73145-3041 Attn: FA Monitor G. PREPARED BY Cliburn, Deanne M 421 SCMS / GUMAA 405-736-4648 20 AUG 2026 I. APPROVED BY //ELECTRONICALLY SIGNED// Pena, Adrian L AFLCMC / LPSE 405-736-3712 / 336-3712 20-AUG-26

Key dates

Bids due
Aug 26, 2027

Documents

  • 2840-01-205-1303NZ_PR27-00220.zip

See all documents · Download with Pro

More from this agency

Similar bids nearby

Closing soon nearby