Micro-Milling, Resurfacing, Guardrail Installation (Steel Blockout Replacement), and Traffic Stripe on SR-59 from CR-80 to Monroe County Line, Baldwin County, Alabama
Alabama Department of TransportationAlabama
The Alabama Department of Transportation is soliciting sealed bids for the construction of micro-milling, resurfacing, guardrail installation (steel blockout replacement), and traffic stripe on SR-59 from CR-80 to the Monroe County Line, Baldwin County, Alabama. Bids must be submitted by 10:00 AM on December 4, 2026, at the Alabama Department of Transportation in Montgomery. A bid bond of 5% of the bid amount (up to $50,000) is required. Bidding proposals and plans are available for purchase at $5.00 and $7.00 per set, respectively. The bracket estimate is $2,468,194 to $3,016,682.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Resurface 11.795 miles of SR-59 from CR-80 to Monroe County Line
- Perform micro-milling and traffic stripe application
Steps to Bid
- 1
Obtain the bid proposal and plans from the Alabama Department of Transportation, 1409 Coliseum Boulevard, Room E-108, Montgomery, AL 36110, for $5.00 and $7.00 per set, respectively.
- 2
Prepare and complete the bid proposal, including the required bid bond.
- 3
Submit the sealed bid, including the bid bond, to the Director of Transportation at the Alabama Department of Transportation, Montgomery, Alabama, by 10:00 AM on December 4, 2026. by Dec 4, 2026, 10:00 AM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130
How to submit
Bids must be sealed and submitted in person or by mail to the Alabama Department of Transportation, Montgomery, Alabama. The bid must include a bid bond of 5% of the bid amount (maximum $50,000.00), made payable to the Alabama Department of Transportation.
In person/mail: Director of Transportation, Alabama Department of Transportation, 1409 Coliseum Boulevard, Room E-108, Montgomery, AL 36110
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Project length: 11.795 miles. Sealed bids will be received by the Director of Transportation at the Alabama Department of Transportation, Montgomery, Alabama, until 10:00 AM on December 04, 2026, and will be publicly opened at that time. Plans and proposals may be purchased at 1409 Coliseum Boulevard, Room E-108, Montgomery, AL 36110. Checks must be made payable to the Alabama Department of Transportation. Plans and proposals will be mailed only upon receipt of remittance. No refunds will be issued. Minimum wage rates are pre-determined by the Secretary of Labor and are specified in the advertised specifications. This bracket is for informational purposes only and should not be used in preparing a bid. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. The project is funded under the Federal Aid Highway Program (STPAA-HSIP-FMGR-0059(523)).
Key dates
- Bids due
- Dec 4, 2026, 10:00 AM CT
More from this agency
- Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II and Type III), and Traffic Stripe on SR-1 (US-431) from… · closes Dec 4, 2026
- Federal Aid Project No. STPAA-HSIP-0021(591) — Resurfacing and Traffic Stripe Work on SR-21, Wilcox County, Alabama · closes Dec 4, 2026
- Federal Aid Project No. NH-FMGR-0001(659) & ATRP2-48-2025-252 — Marshall County, Alabama · closes Dec 4, 2026
- Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II and Type III), and Traffic Stripe on SR-169 from SR-1… · closes Dec 4, 2026
- Federal Aid Project No. STPAA-0193(512) — Resurfacing and Traffic Stripe on SR-193, Mobile County, Alabama · closes Dec 4, 2026
Similar bids in Alabama
- Federal Aid Project No. STPAA-FMGR-0117(514) — Jackson County, Alabama · closes Dec 4, 2026
- Micro-Milling, Resurfacing (Scrub Seal), Patching, Guardrail Installation, and Traffic Stripe on SR-25 from SR-3 (US… · closes Dec 4, 2026
- FY27 Service Contract for Preventative Maintenance and Repairs on 6 John Deere Tractors at Clarke Range Complex,… · closes Nov 30, 2026
- Nimble Options for Buying Layered Effects (NOBLE) Announcement – Multiple Authority Solicitation Vehicle · closes Mar 27, 2030
- Federal Aid Project No. STPAA-FMGR-HSIP-0139(505) BIBB COUNTY, ALABAMA · closes Dec 4, 2026
Closing soon in Alabama
- RFP for 2025–2035 Statewide Historic Preservation Plan, Alabama Historical Commission · closes Nov 30, 2026
- Fairhope Middle School Boiler Replacement · closes Dec 3, 2026
- HVAC Maintenance, Repair, and Tune-Up for State Cattle Ranch and Field Trial Area · closes Dec 3, 2026
- Resurfacing and Traffic Stripe on CR-77 from CR-22 to SR-74 (US-278) Southeast of Addison, Winston County, Alabama · closes Dec 4, 2026
- Construction of Pre-Manufactured Terminal Building at Carl Folsom Airport · closes Dec 4, 2026