OpenRFPCloses Dec 10, 2026

Flooring Job Order Contracts (JOC 2712 and 2713) - Class C15 License

County of San Mateo — Public Works - Capital ProjectsRedwood City, California#2027-RFP-00201

The County of San Mateo's Department of Public Works is seeking qualified contractors with a Class C15 license to provide flooring services under two Job Order Contracts (JOC 2712 and 2713). Work may be performed at any location under the Owner’s jurisdiction. The Department intends to award up to two contracts, each with a maximum fiscal obligation of $2,000,000 over a one-year term. The lowest responsive and responsible bidder will be selected for each contract but excluded from consideration for the second. The target start date and final agreement term are subject to negotiation.

On PublicBidSearch: the original bid posting for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 10, 2026
Time stated in bid documents
Dec 10, 2026, 2:00 PM Pacific Time
Submission
electronic portal

Scope of work

  • Install and repair flooring at various County facilities
  • Provide all labor, materials, tools, and equipment required
  • Service up to two contracts with $2M maximum per agreement
  • Work to be performed under separate Job Orders-Notice to Proceed

Steps to Bid

  1. 1

    Register with the County of San Mateo procurement portal

  2. 2

    Submit questions to the designated contact by the questions deadline (not specified)

  3. 3

    Submit the proposal by the due date and time by Dec 10, 2026, 2:00 PM

What you'll need

Submission

Electronic portal

How to submit

Submit via the County of San Mateo procurement portal at Official linkPro

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The anticipated services are to be performed within a designated area of the County. However, if the need arises, the Owner reserves the right to require the Contractor to work at any location or facility under the jurisdiction of the Owner. The work to be done consists, in general, of providing all labor, materials, tools, appurtenances, and equipment required as well as any other items and details not mentioned but required by the Contract Documents and as directed by the Director of Public Works or the Director's designee. The target start date and term for the proposed services are subject to negotiation of a final agreement, through the completion of the projects.

Key dates

Bids due
Dec 10, 2026

More from this agency

Closing soon near Redwood City