OpenRFP

FORGED-PFC Vacuum Vessels

Oak Ridge National LaboratoryOak Ridge, Tennessee

Materials specified include 304L or 316L Stainless Steel. Operating temperatures can reach up to 450 K. The project is located in Clinton, TN. The estimated value is $1M. The expected issue date is November 25, 2026, with an expected award date of January 13, 2027.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Documents analyzed
4

Scope of work

  • Includes water-cooled walls and ports.
  • Located at Bull-Run Fossil Plant, Clinton, TN.

Steps to Bid

  1. 1

    Inform the Procurement Officer of interest in being placed on the bid list and send capability statement.

    Please reach out to the Procurement Officer whose email address is shown above. Inform them of your interest in being placed on the bid list for this requirement. You may also send your capability statement, preferably one page.

  2. 2

    Prepare and submit a Project Schedule by 10 business days of contract award

    The Seller shall prepare a baseline integrated Project Schedule within 10 business days of contract award.

  3. 3

    Submit Pre-Shipment Deliverable Package No. 1

    A pre-shipment Deliverable Package shall be provided by the Seller no later than 10 business days after the acceptance of validation testing from equipment fabrication.

  4. 4

    Submit Pre-Shipment Deliverable Package No. 2

    Pre-Shipment Deliverable Package #2 is to be provided no later than two weeks prior to planned date of shipment.

What you'll need

NAICS

334516

How to submit

Please reach out to the Procurement Officer whose email address is shown above. Inform them of your interest in being placed on the bid list for this requirement. You may also send your capability statement, preferably one page.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

It includes numerous ports and feedthroughs for diagnostics, pumping, and electron beam connections. The scope covers design, fabrication, and factory acceptance testing. Supporting equipment, electron beams, helium loops, test article diagnostics, and associated instrumentation are excluded. The vessel is not required to be code stamped. The cylindrical portion shall have an outside diameter of 3 +0/-0.1 meters and a minimum length of 2.1 meters. The ellipsoidal head shall have a Major-to-Minor axis ratio of no less than 2:1. The door shall weigh less than 2000 kg. Wall thicknesses for all pressure boundaries will be sized to meet applicable loads. The vessel will have two burst disks (500 mm diameter) and a manual drain valve. Fasteners shall be Stainless Steel (Class A2 or A4). Gaskets for CF Flanges shall be OFHC Copper, and for ISO-F and Door seals, Viton/FKM. Burst disk gaskets shall be elastomeric. Materials for cooling circuits must be 304/304L or 316/316L stainless steel, excluding aluminum, brass, carbon steel, zinc, cadmium, lead, and silicone. Operating temperatures for the inner vessel pressure boundary are up to 450 K. The vessel shall be designed to withstand positive external pressure up to 3 bar (abs) from the cooling circuit.

Key dates

Expected award
Jan 13, 2027

Documents

  • FORGED_PFC_Vacuum_Vessel_SOW_Approved.pdf18 pages
  • VV_Load_Inputs_21OCT2026_0.pdf7 pages
  • FORGED_PFC_VV_Drawing_Pack_15OCT2026.pdf8 pages
  • FORGED_PFC_VV_Technical_Specification_Approved.pdf30 pages

See all documents · Download with Pro

More from this agency

Similar bids near Oak Ridge

Closing soon near Oak Ridge