FP System-Wide CSO Regulator Improvements
Narragansett Bay Commission — Quasi-PublicProvidence, Rhode Island#306.10 C
Work includes new sewer interceptor connections, pipe replacement, trash rack installation, and other site-specific construction. The project must be completed within 365 consecutive calendar days from the Notice-to-Proceed. Bidders must submit a 5% bid deposit, and the successful contractor must provide 100% Performance and Payment Bonds.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 15, 2026
- Time stated in bid documents
- Dec 15, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 2
- Required submission items
- 4 items · full checklist with Pro
Scope of work
- Improve 6 below-grade CSO regulator structures in Providence, Pawtucket, and Central Falls
- Replace existing sewer pipes
- Install trash racks at regulator sites
- Complete all work per Section 01010 specifications
Steps to Bid
- 1
Obtain the full contract documents from the official planroom link: Official linkPro
- 2
Ensure the bid is accompanied by a bid deposit of 5% of the total bid price. by Dec 15, 2026, 2:00 PM
- 3
The successful bidder must provide 100% Performance Bond and 100% Payment Bond prior to contract execution.
What you'll need
Contract duration
365 consecutive calendar days from the Notice-to-Proceed
Submission
Mail, Hand delivery
NAICS
237130
How to submit
Bids must be submitted in sealed envelopes. A second printed copy must be provided for public inspection upon bid opening.
In person/mail: Narragansett Bay Commission, NBC Corporate Office Building, 1 Service Road, Providence, RI 02905
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project is not subject to Buy America (BABA) requirements. Bids may not be withdrawn for 90 calendar days after opening.
Key dates
- Pre-bid meeting
- Dec 1, 2026, 10:00 AM Eastern Time
- Site visit
- Dec 1, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 15, 2026
Documents
- 306.10-C-NTB.pdf2 pages
- 306.10_C.pdf1 pages
Similar open bids
Closing this week nearby
- Marketing Strategy Services for URI Feinstein College of Education — closes Nov 17, 2026
- Truck Body Transfer and PTO Installation — closes Nov 17, 2026
- Truck Body Transfer and PTO Installation for Waste Collection Vehicle — closes Nov 17, 2026
- 2027 Ford Police Interceptor Utility & F-150 Police Responder Vehicles — closes Nov 17, 2026
- P084 Next Generation Torpedo Integration Lab Construction – Brand Name or Equal Items Notice — closes Nov 17, 2026