Fremd Village Building Pressure Wash Project
Pahokee Housing AuthorityFlorida
Bids must include separate pricing for fiberglass and metal roofing. A pre-bid meeting is mandatory on November 19, 2026, at 1:30 pm at 465 Friend Terrace, Pahokee, FL. The contract period is 60 calendar days from Notice to Proceed to Substantial Completion.
On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 3, 2026, 2:00 PM Eastern Time
- Submission
- mail, hand delivery
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Pressure wash 5 one-story apartment buildings
- Pressure wash 29 two-story apartment buildings
- Separate line-item pricing for fiberglass and metal roofing
Steps to Bid
- 1
Attend the mandatory pre-bid meeting on November 19, 2026, at 1:30 pm at 465 Friend Terrace, Pahokee, FL. was Nov 19, 2026, 1:30 PM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit a sealed bid by December 3, 2026, at 2:00 pm local time. by Dec 3, 2026, 2:00 PM
What you'll need
Contract duration
60 calendar days from the Notice to Proceed for Construction to Substantial Completion
Submission
Mail, Hand delivery
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Bids will be received no later than Thursday, December 3, 2026, at 2:00 pm local time, at which time they will be publicly opened and read aloud. A pre-bid meeting will be held on Thursday, November 19, 2026, at 1:30 pm local time at the main office located at 465 Friend Terrace, Pahokee, Florida. The project consists of furnishing all labor and materials for pressure washing 5 one-story apartment buildings and 29 two-story apartment buildings within Fremd Village. Pricing must be balanced per unit type and roof type. Line items may be removed based on funding availability versus bid prices. Contractors are responsible for their own water and electricity use at job sites. The contract is a single prime contract based on a stipulated price. The contract period is 60 calendar days from the Notice to Proceed for Construction to Substantial Completion, as defined in the Supplementary Conditions of the Contract. Liquidated damages may apply as stated in the Supplementary Conditions.
Key dates
- Pre-bid meeting
- Nov 19, 2026, 1:30 PM Eastern Time
- Bids due
- Dec 3, 2026
Similar bids in Florida
- Trafalgar Elementary School Parent Pick-up Renovation · closes Nov 30, 2026
- NORTHLAKE BLVD/140TH AVE PANTHER NATIONAL INTERSECTION Construction Project · closes Dec 9, 2026
- Complete Streets Project: Virginia Drive, Forest Avenue, and Corrine Drive — IFB27-0003
- Turfco 1550 Topdresser or Approved Equal · closes Dec 8, 2026
- Rotorcraft Repair & Manufacturing (RRM) · closes Dec 18, 2026
Closing soon in Florida
- Mobile CT Scanner Lease · closes Nov 30, 2026
- ANAB Accreditation · closes Dec 1, 2026
- Emergency Trailer-Mounted Generators for Burnt Store Reverse Osmosis Water Treatment Plant · closes Dec 2, 2026
- Resurfacing and Traffic Control Improvements on SR 563 in Polk County, Florida · closes Dec 2, 2026
- Request for Information: WaySync Software Suite · closes Dec 3, 2026