OpenConstructionCloses Dec 3, 2026

Fremd Village Building Pressure Wash Project

Pahokee Housing AuthorityFlorida

Bids must include separate pricing for fiberglass and metal roofing. A pre-bid meeting is mandatory on November 19, 2026, at 1:30 pm at 465 Friend Terrace, Pahokee, FL. The contract period is 60 calendar days from Notice to Proceed to Substantial Completion.

On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 2:00 PM Eastern Time
Submission
mail, hand delivery
Required submission items
1 items · full checklist with Pro

Scope of work

  • Pressure wash 5 one-story apartment buildings
  • Pressure wash 29 two-story apartment buildings
  • Separate line-item pricing for fiberglass and metal roofing

Steps to Bid

  1. 1

    Attend the mandatory pre-bid meeting on November 19, 2026, at 1:30 pm at 465 Friend Terrace, Pahokee, FL. was Nov 19, 2026, 1:30 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Submit a sealed bid by December 3, 2026, at 2:00 pm local time. by Dec 3, 2026, 2:00 PM

What you'll need

Contract duration

60 calendar days from the Notice to Proceed for Construction to Substantial Completion

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Bids will be received no later than Thursday, December 3, 2026, at 2:00 pm local time, at which time they will be publicly opened and read aloud. A pre-bid meeting will be held on Thursday, November 19, 2026, at 1:30 pm local time at the main office located at 465 Friend Terrace, Pahokee, Florida. The project consists of furnishing all labor and materials for pressure washing 5 one-story apartment buildings and 29 two-story apartment buildings within Fremd Village. Pricing must be balanced per unit type and roof type. Line items may be removed based on funding availability versus bid prices. Contractors are responsible for their own water and electricity use at job sites. The contract is a single prime contract based on a stipulated price. The contract period is 60 calendar days from the Notice to Proceed for Construction to Substantial Completion, as defined in the Supplementary Conditions of the Contract. Liquidated damages may apply as stated in the Supplementary Conditions.

Key dates

Pre-bid meeting
Nov 19, 2026, 1:30 PM Eastern Time
Bids due
Dec 3, 2026