OpenRFPCloses Nov 30, 2026

Fuel Cell, Aircraft

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038327QSA22

The U.S. Navy is soliciting proposals for the repair, testing, and inspection of aircraft fuel cells. The contractor must comply with MIL-STD-130 markings, use SAE-AS22759 wire, and maintain a quality control system per Mil-I-45208A, Mil-Q 9858, or ISO 9000/9001/9002. All purchased materials must be inspected upon receipt. The contractor is responsible for all repair, test, and inspection procedures, including maintaining historical records for each unit. The Government may conduct performance and quality testing on selected units. Early and incremental deliveries are encouraged.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 30, 2026
Time stated in bid documents
Nov 30, 2026, 3:30 PM Eastern Time
Submission
electronic portal

Scope of work

  • Use SAE-AS22759 wire, not MIL-W-81381
  • Submit failure analysis and corrective action reports

Steps to Bid

  1. 1

    Register on Official linkPro and ensure active status.

  2. 2

    Review the solicitation on Official linkPro at the provided URL.

  3. 3

    Submit questions to the contact listed before the due date. by Nov 30, 2026, 3:30 PM

  4. 4

    Prepare and submit proposal by the due date and time. by Nov 30, 2026, 3:30 PM

What you'll need

Submission

Electronic portal

NAICS

336413

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The contractor shall repair, test, and inspect units in accordance with MIL-STD-130 markings, SAE-AS22759 wire (prohibiting MIL-W-81381 wire), and applicable technical data packages. Nonconforming material must be segregated and dispositioned per approved procedures. The contractor may use an Internal Review Board (IRB) for minor non-conformances, but not for 'as-is' disposition. Formal Material Review Board (MRB) authority for 'as-is' and minor non-conformances remains with the Government. All quality assurance data, inspection reports, and repair records must be maintained for at least 12 months post-acceptance and made available upon request. The contractor must comply with all requirements of this Statement of Work, and absence of inspection requirements in the SOW does not relieve the contractor of responsibility to ensure compliance. Early and incremental deliveries are accepted and preferred.

Key dates

Questions due
Nov 30, 2026, 3:30 PM Eastern Time
Bids due
Nov 30, 2026

More from this agency

Similar bids in Pennsylvania

Closing soon in Pennsylvania