Repair, Overhaul, and Testing of Fuel Feed Cell, Air
Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038327QSA23
The U.S. Navy is soliciting proposals for the repair, overhaul, testing, and inspection of fuel feed cells, air. The contractor must perform disassembly, cleaning, inspection, repair or replacement, reassembly, and testing in accordance with approved repair manuals. The contractor is responsible for all manufacturing aids and must not use MIL-W-81381 wire; SAE-AS22759 wire must be used instead. The Government may conduct repair assessment testing on randomly selected items. Historical records for each item must be maintained for 12 months after acceptance. The contractor must comply with Buy American, Free Trade Agreements, and security prohibitions. The contractor must use Workflow Pro (WFP) Mod Assist Module. A 12-month warranty is required, with 60 days after discovery of defect. The contractor must be compliant with all applicable federal regulations and contract clauses.
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 7, 2026
- Time stated in bid documents
- Dec 7, 2026, 3:30 PM Eastern Time
- Submission
- electronic portal
Steps to Bid
- 1
Register on Official linkPro and obtain a CAGE code if not already registered.
- 2
Review the solicitation notice and all attached clauses and requirements.
- 3
Submit questions to the contracting officer by the deadline specified in the solicitation. by Dec 7, 2026, 3:30 PM
- 4
Prepare and submit the proposal in accordance with the instructions. by Dec 7, 2026, 3:30 PM
What you'll need
Submission
Electronic portal
NAICS
336413
How to submit
Submit proposal via the Official linkPro portal. Ensure all required documents are included and submitted by the deadline.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The contractor shall repair, overhaul, test, inspect, and return to a Ready for Issue (RFI) condition all subject items as specified in this Statement of Work. Items to be overhauled or repaired must be disassembled, cleaned, inspected, repaired or replaced as necessary, reassembled, and tested in accordance with the approved repair/overhaul manual. All purchased material must be inspected upon receipt and records maintained for at least 12 months after acceptance. Nonconforming material must be controlled through identification, segregation, and disposition. The contractor shall maintain a historical record file for each CLIN and assembly, including receipt inspection documentation, repair shop travelers, parts replacement records, parts inspection data, and acceptance test data. MIL-STD-130 markings are required. The use of MIL-W-81381 wire is prohibited; SAE-AS22759 series wire must be used in its place. The contractor is responsible for all manufacturing aids (fixtures, jigs, dies, patterns, special tooling, test equipment) and must not expect the Government to provide them. The Government may select samples of repaired items for performance, environmental, and quality conformance testing at CFA or other designated location. The contractor shall submit failure analysis and corrective action reports. The Material Review Board (MRB) authority for 'AS-IS' disposition and minor non-conformances is retained by the Government. The Contractor Internal Review Board (IRB) may be used only for minor non-conformances, scrap, or rework to return a part to conformance, and may not use 'AS-IS' disposition. A complete file of IRB actions shall be maintained for Government review. All items must meet all requirements of this Statement of Work. The absence of inspection requirements in the SOW does not relieve the contractor of responsibility to ensure compliance. Sampling does not authorize submission of defective items. The contractor shall comply with all applicable clauses including Buy American, Free Trade Agreements, Balance of Payments Program, and Security Prohibitions. Equal opportunity for workers with disabilities is required. The contractor shall provide warranty of supplies of noncomplex nature for 12 months, with 60 days after discovery of defect.
Key dates
- Questions due
- Dec 7, 2026, 3:30 PM Eastern Time
- Bids due
- Dec 7, 2026
More from this agency
- Meter, Fluid Flow In - Procurement of Repair Parts for Naval Weapon Systems Support · closes Dec 7, 2026
- Scanner Assembly, AI, in Repair/Modification · closes Dec 7, 2026
- Procurement of Externally Threaded Ring Components (N0010427QBC40) · closes Dec 7, 2026
- Repair/Modification of Data Entry Keyboards (NSN 7H-7025-013825796) — Forecasted Procurement · closes Dec 7, 2026
- Aircraft Fuel Storage Tanks · closes Dec 7, 2026
Similar bids in Pennsylvania
- Repair of Alternating Current Motor (Motor, Alternating C) · closes Nov 27, 2026
- Power Supply Procurement · closes Dec 4, 2026
- Street Lighting, Parking Meters, and Street Furniture (AKA Streetscape) · closes May 24, 2027
- 16--GENERATOR,VARIABLE, IN REPAIR/MODIFICATION OF · closes Dec 3, 2026
- Repair of Circuit Card Assembly (Circuit Card Assemblies) · closes Nov 30, 2026
Closing soon in Pennsylvania
- 16--BLADE,ROTARY RUDDER · closes Nov 30, 2026
- Purchase of Check Valves for Shipboard Systems · closes Nov 30, 2026
- Invitation to Bid: Foodservice Cafeteria Tables · closes Dec 1, 2026
- Laser Cutter & Engraver Procurement — Fox Chapel Area School District · closes Dec 2, 2026
- Advertisement for Bids: Multiple Prime Contracts for Construction for General Construction, including sitework and… · closes Dec 2, 2026