Fuel Station Upgrade Project
Muscogee County School DistrictGeorgia#PE-55046-NONST-2027-000000029
The CM will oversee demolition and new construction of fuel station buildings and canopies, replacement of underground fuel storage tanks and pumps, and upgrade of the digital fueling control system. The contract will be awarded under the AIA A133-2019 agreement with cost-plus-fee and a guaranteed maximum price. Bidders must attend a mandatory pre-proposal conference on December 8, 2026, at 10:30 a.m. in Columbus, Georgia. Proposals must be submitted in one original and six copies by 2:00 p.m. on January 6, 2027, to the Office of the Director of Construction. Evaluation is based on stability (20%), experience (20%), management plan (15%), past performance (20%), and fee (25%). The proposal must include an itemized estimate of general requirements costs using Schedule A. Proposals must remain valid for 45 days after opening.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 5, 2027
- Bid bond
- 100%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- The contract will be for the cost of the work plus a fee, with a guaranteed maximum amount.
- Documents analyzed
- 2
- Required submission items
- 8 items · full checklist with Pro
Scope of work
- Demolish and replace existing gasoline and diesel fuel station buildings and canopies
- Remove and replace all existing underground gasoline and diesel fuel storage tanks and associated pumps
- Upgrade or replace the existing digital fueling control and record system
- Provide pre-construction services including cost estimating, constructability analysis, and scheduling
- Serve as Construction Manager at Risk (CM) with guaranteed maximum price (GMP)
Steps to Bid
- 1
Attend the mandatory pre-proposal conference on December 8, 2026, at 10:30 a.m. at 5661 Lorenzo Road, Columbus, Georgia 31904. Failure to attend will result in disqualification. by Dec 8, 2026, 10:30 AM
What you'll need
Contract duration
The Project is to be performed pursuant to the AIA A133-2019 Standard Form of Agreement with payment based on the cost of work, plus a fee and with a guaranteed maximum price.
Submission
Mail, Hand delivery
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 8-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project involves demolition and new construction to replace existing gasoline and diesel fuel station buildings and canopies, removal and replacement of all existing underground gasoline and diesel fuel storage tanks and associated fuel pumps, and upgrading or replacing the existing Digital Transaction Fueling Control-Record System at the Whitesville Plant Services Facilities, as budget permits. The CM will serve as both general contractor and construction manager under the AIA A133-2019 Standard Form of Agreement, with payment based on the cost of work plus a fee and a guaranteed maximum price (GMP). The project will include all construction trades. The successful proposer must attend a mandatory pre-proposal conference on December 8, 2026, at 10:30 a.m. at 5661 Lorenzo Road, Columbus, Georgia 31904.
Key dates
- Pre-bid meeting
- Dec 8, 2026, 10:30 AM Eastern Time
- Bids due
- Jan 5, 2027
Documents
- 202611_supportingdocs_PE-55046-NONST-2027-000000029-2026-11-18_17_03_73-ab2b.pdf12 pages
- 202611_supportingdocs_PE-55046-NONST-2027-000000029-2026-11-19_15_39_50-d893.pdf1 pages
More from this agency
- Renovation and Painting Project for Seven Schools · closes Dec 15, 2026
- General Construction Services for Campus Enclosure - Phase Two · closes Jan 6, 2027
Similar bids in Georgia
- Construction Time and Materials · closes Dec 10, 2026
- Buford Senior Academy Modifications — Roofing, Metal Wall Panels, HVAC, Electrical, and Fire Alarm Work · closes Dec 10, 2026
- planeside passenger and flight crew shuttle · closes Nov 30, 2026
- Compton ES Renovation · closes Dec 3, 2026
- Sponsor-A-Highway Program (T50) · closes Dec 10, 2026
Closing soon in Georgia
- FY27 Network Switches · closes Nov 30, 2026
- Hydraulic Modeling and System Analysis Program · closes Nov 30, 2026
- Sole Source Purchase of MineScape for Geologists Software and Maintenance · closes Nov 30, 2026
- VIP Parking Lot for Augusta Regional Airport · closes Dec 3, 2026
- Routine Maintenance Services - District 3 · closes Dec 3, 2026