FWE & NS CN Equipment - RFP#YESP2027-04
YES Prep Public SchoolsHouston, Harris, Texas#RFP#YESP2027-04
The equipment must be supplied, assembled, and set in place with lift gate truck unloading due to no loading dock. Proposals must include itemized pricing, a detailed installation plan, and references. Questions are due by 5:00 PM on December 2, 2026.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 9, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 9, 2026, 10:00 AM Central Time
- Submission
- electronic portal
- Documents analyzed
- 6 published · 4 analyzed
Scope of work
- Supply and install 3 two-door reach-in refrigerators (True or equivalent)
- Supply and install 1 single-door reach-in freezer (Traulsen or equivalent)
- Supply and install 2 mobile milk coolers (True Mfg or equivalent)
- Supply and install 2 mobile serving stations (FEW HLC-4W6-7H-28-HWR)
- Supply and install 2 rethermalization & holding cabinets (Cres Cor or equivalent)
- Supply and install 4 four-foot stainless steel worktables (Advance Tabco or equivalent)
Steps to Bid
- 1
Submit all required attachments: (1) RFP#YESP2027-04 (FWE and NS CN Equipment) package; (2) Vendor Package; (3) Cost/Proposal Sheet with itemized pricing; (4) Installation plan and timeline; (5) References (three required). by Dec 9, 2026, 10:00 AM
- 2
Submit questions via the eBid system’s Questions section by 5:00 PM on December 2, 2026. by Dec 2, 2026, 5:00 PM
- 3
Ensure all required fields in the online form are completed, including company name, address, principal place of business, authorized agent details, and electronic acknowledgment of contract terms. by Dec 9, 2026, 10:00 AM
What you'll need
Submission
Electronic portal
NAICS
339999
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
All equipment must be delivered to the first floor of each campus with no loading dock; a lift gate truck is required for unloading. The proposal must include itemized pricing for all products, materials, machinery, manpower, installation, customization, implementation, warranty (minimum one year), permits, and unforeseen expenses. A preliminary installation schedule and staffing plan must be submitted. The response must be submitted electronically via the eBid system by 10:00 AM on December 9, 2026. The solicitation is open to all responsive bidders. The contract term is not specified.
Key dates
- Questions due
- Dec 2, 2026, 5:00 PM Central Time
- Bids due
- Dec 9, 2026, 10:00 AM CT
Documents
- Bid_Invitation.pdf10 pages
- Public_Question_Answer.PDF1 pages
- RFP_YESP2027-04_FWE_NS_CN_Equipment_.pdf
- Cres_Cor.pdf1 pages
- CN_Equipment_RFP.pdf2 pages
- Bid_Invitation.pdf10 pages
More from this agency
- GU Lounge Conversion · closes Dec 9, 2026
- Monument Sign & Building · closes Dec 11, 2026
- Managed Direct Internet Access · closes Jan 11, 2027
- Infrastructure Equipment · closes Jan 11, 2027
- Direct Internet Access · closes Jan 11, 2027
Similar bids near Houston
- Athletic/ P.E. Equipment and Uniforms · Houston · closes Jul 31, 2028
- Classroom, Laboratory, and Vocational Supplies, Equipment and Related Items · Houston · closes Dec 17, 2026
- Tools and Hardware - Multiple Award Request for Proposal · Houston · closes Jan 31, 2027
- Instructional, Classroom & Campus Materials, Equipment & Supplies · Houston · closes Mar 31, 2028
- Commercial Low Earth Orbit (LEO) Destination Contract (CLDC) Request for Proposal · Houston · closes Dec 14, 2026
Closing soon near Houston
- HERBICIDE, LIQUID,ROUNDUP PROMAX, 30 GL · Houston · closes Dec 1, 2026
- Contract Labor for Banquet and Catering #27-02-3900R-RFP · Houston · closes Dec 2, 2026
- FBCMUD No. 212 Amandera, Section 9A Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving · Houston · closes Dec 3, 2026
- Automotive, Ford Motor Car/ Light/Medium/ Heavy Duty Truck Replacement Parts And Repair Services · Houston · closes Dec 3, 2026
- Conflict Management Training and Facilitated Workplace Intervention · Houston · closes Dec 3, 2026