OpenOtherCloses Sep 30, 2027

FY27 Anticipated Stone Work Requirements in the Mississippi Valley Division (MVD) — Memphis, Vicksburg, and New Orleans Districts

Dept of the Army — W07V ENDIST VICKSBURGMississippi#W912MVD270002

This is a forecast of anticipated stone construction and repair work in the Mississippi River system during FY2027, covering the Memphis, Vicksburg, and New Orleans Districts. Work includes river training structures such as dikes, revetments, and chevrons, as well as land-based stone placement and repairs. Projects are expected to be awarded under MATOC or SATOC contracts. The Vicksburg District plans to award the Fort Jackson project under a SATOC. All project details are subject to change as designs are finalized. Bidders should contact the respective district Small Business Professionals or Contracting Chiefs for further information.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Sep 30, 2027
Documents analyzed
1

Scope of work

  • Placement of crushed stone blanket and riprap on upper banks
  • Stone fill and paving in dike fields and overbank areas
  • Bank grading and excavation for river training structures
  • Installation and painting of range markers and clearing of range lines
  • Work in varying water depths and currents

Steps to Bid

  1. 1

    Review the official notice and attached document (Stone_Chart_FY27.pdf) for project scope and anticipated contract type.

  2. 2

    Contact the appropriate District Small Business Professional or Contracting Chief to express interest and request additional information.

  3. 3

    Register with Official linkPro and ensure all required certifications are current.

  4. 4

    Monitor for the formal solicitation, which will be issued as a task order under a MATOC or SATOC contract.

What you'll need

NAICS

237990

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

This special notice provides projected stone work requirements for Fiscal Year 2027 within the Mississippi Valley Division (MVD), including the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts. Repair work may involve removal and redistribution of stone from existing dikes and revetments, breaking out pavement, placement and painting of range markers, and clearing of range lines. All project information is subject to change as designs are refined and impacts are quantified. The Memphis District anticipates awarding the Stack Island Dike project under a Multiple Award Task Order Contract (MATOC). The New Orleans District has no specific project listed in this notice.

Key dates

Bids due
Sep 30, 2027

Documents

  • Stone_Chart_FY27.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby