Gamble Hall Roof Repair - Lower Roof Sections
University of North DakotaGrand Forks, North Dakota#FM-367-2027
Work includes removing and replacing roofing materials, insulation, flashing, and ballast. The project must be completed by December 15, 2026. Required insurance includes $2M commercial general liability, $500K per person/$2M per occurrence auto liability, workers’ compensation, and $1M employer’s liability. The bid must be submitted electronically via the Jaggaer Sourcing Portal by 2:00 PM CT on November 19, 2026. A pre-bid meeting is scheduled for November 12, 2026, at 10:30 AM CT at Gamble Hall West Lobby, 293 Centennial Drive, Grand Forks, ND 58202. The contract term begins on November 26, 2026, and ends on a date to be determined. No automatic renewal. The contract may be extended for up to 12 months. The bid must be held firm for 90 days.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 19, 2026, 2:00 PM CT
- Time stated in bid documents
- Nov 19, 2026, 2:00 PM Central Time
- Submission
- electronic portal
- Contract term
- This Contract term (Term) begins on November 26th, 2026 or its Effective Date, and ends on TBD. + No renewal options.
- Documents analyzed
- 4
Scope of work
- Repair roof sections 5 and 7 of Gamble Hall
- Remove existing EPDM, ballast, and sheet metal
- Replace wet or damaged insulation
- Install 1/2-inch coverboard
- Install 60-mil EPDM with new ballast
- Seal all penetrations
Steps to Bid
- 1
Register on the UND Jaggaer Sourcing Portal if not already registered. Contact the Procurement Officer to be invited to submit a bid response.
- 2
Submit all required documents via the Jaggaer Sourcing Portal by the bid deadline. was Nov 19, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Electronic portal
NAICS
236220
Get alerts for bids like this
New roofing bids in North Dakota
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Work includes removal of existing EPDM, ballast, and sheet metal; replacement of wet or damaged insulation; installation of 1/2-inch coverboard; installation of 60-mil EPDM with new ballast; sealing of all penetrations; fabrication and installation of new sheet metal flashing and overflow scupper(s); and installation of termination bar and counterflashing.
Documents
- 1467423-14374492134._Risk_Mgmt_-_Moderate_non-professional_54_.docx
- 1467423-2124055604Bidders_Instructions_Award_9_.docx
- 1467423-2124055276BIDDER_INFORMATION_AND_SIGNATURE_67_1_.pdf1 pages
- 1467423-event.pdf8 pages
More from this agency
- Condensate Line Replacement on UND Campus (MH1-9 to University Avenue) · closes Dec 3, 2026
- Condensate Line Replacement on UND Campus (MH1-2 to MH1-3) · closes Dec 3, 2026
- UND Condensate Replacement 1130 (MH2-17 to Burtness Theater) · closes Dec 3, 2026
- Condensate Replacement on UND Campus — FM-368-2027 to FM-372-2027 · closes Dec 3, 2026
- Condensate Line Replacement on UND Campus (MH1-7 to 2nd Avenue) · closes Dec 3, 2026
Closing soon near Grand Forks
- UND 2027 Condensate Replacement Projects (FM369, 369, 370, 371, 372) · Grand Forks · closes Dec 3, 2026
- Condensate Line Replacement on UND Campus (FM-369-2027) · Grand Forks · closes Dec 3, 2026
- Terminal Elevator Expansion Electrical Project – North Dakota Mill and Elevator, Grand Forks, ND · Grand Forks · closes Dec 3, 2026
- Flooring Requirements Contract · Grand Forks AFB · closes Dec 3, 2026
- Campus Sewer Jetting · Grand Forks · closes Dec 4, 2026