OpenRFPCloses Nov 27, 2026, 1:00 PM CT

Gate Valve Frame Replacement at Barksdale AFB

Dept of the Air Force — FA4608 2 CONS LGCBarksdale AFB, Louisiana#FA460826QS053

The U.S. Air Force is seeking a contractor to replace two rusted vertical frame pieces and one horizontal brace of a gate valve at Flag Lake, Barksdale AFB, LA. Work includes removing and reinstalling an electric motor actuator and top headrail, field-drilling bolt holes, and reattaching the structure to the concrete headwall per manufacturer specs. The contractor must ensure the gate operates freely and seals properly. All labor, tools, logistics, and disposal of removed materials are included. The period of performance is 90 days. Offers must be submitted via email by 1:00 PM CDT, 27 Nov 2026. The government may reject any or all offers.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 27, 2026, 1:00 PM CT
Time stated in bid documents
Nov 27, 2026, 1:00 PM Central Time
Submission
email
Documents analyzed
3

Steps to Bid

  1. 1

    Register in Official linkPro and obtain a SAM UEI number.

  2. 2

    Review Attachment 1, Statement of Work, Dated 01 Sep 2026, and Attachment 2, Wage Determination.

  3. 3

    Prepare a technical plan not exceeding two pages outlining how the offeror will accomplish the task, including methodology, labor, tools, and safety procedures.

  4. 4

    Submit the offer via email to Michael Lipscomb at [email available with Pro] by 1:00 PM Central Daylight Time (CDT), Friday, 27 Nov 2026. by Nov 27, 2026, 1:00 PM

What you'll need

Contract duration

90 days

Submission

Email

NAICS

811310

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 7 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work includes temporarily removing an existing electric motor-driven actuator and retained top headrail, unbolting the frame from its primary lower concrete headwall connection, field-drilling bolt holes to align and secure the retained headrail to the new vertical components, and reattaching the reassembled structure to the concrete headwall strictly in accordance with original gate manufacturer specifications. Following reinstallation of the headrail and motor actuator, the Contractor shall verify that the gate valve is fully operational, traveling freely and without obstruction between the fully open position and achieving a proper seal upon complete closure. The contractor shall provide all logistics, labor, tools, and lawful disposal of all materials and removed components IAW Attachment 1, Statement of Work, Dated 01 Sep 2026. The government reserves the right to cancel this solicitation or award on a partial basis. Offers must be submitted via email to the Contract Specialist by 1:00 PM Central Daylight Time (CDT), Friday, 27 Nov 2026.

Key dates

Bids due
Nov 27, 2026, 1:00 PM CT

Documents

  • Combined_Synopsis_Solicitation_-_FA4608QS053.pdf9 pages
  • Attachment_1_-_Statement_of_Work.pdf1 pages
  • Attachment_2_-_Wage_Determination.pdf7 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby