GEM Cart Full Wrap
City of North Augusta — Parks and RecreationNorth Augusta, South Carolina#2026-017-Tourism
on November 19, 2026. The vehicle is a brand-new GEM e4 with a length of 135 in, width of 55.5 in, height of 73 in, and dry weight of 1,135 lbs.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 19, 2026
- Time stated in bid documents
- Nov 19, 2026, 5:00 PM Eastern Time
- Submission
- Documents analyzed
- 6 published · 1 analyzed
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Digital mockups and proofs for City approval
- Professional installation with clean edges and no bubbles
- UV-protective laminate for outdoor durability
- Workmanship and material warranties included
Steps to Bid
What you'll need
Submission
NAICS
336118
Get alerts for bids like this
New transportation bids in South Carolina
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Bidders must have demonstrated experience in commercial vehicle/fleet vinyl wrapping. The vehicle is a brand-new GEM e4 with the following dimensions: Length 135 in (342 cm), Width 55.5 in (141 cm), Height 73 in (186 cm), Wheelbase 101 in (256.5 cm), Ground Clearance 8 in (20.3 cm), Dry Weight 1,135 lbs (515 kg), GVW 2,500 lbs (1,134 kg), Payload Capacity 1,364 lbs (619 kg), Motor Size 6.5 kW / 8.7 HP, Battery Lithium Ion, Top Speed 25 mph (40 km/h).
Documents
- GEM_e4_Specs.pdf3 pages
- GEM_Cart_Design.pdf1 pages
- GEM_e4_Specs.pdf3 pages
- GEM_Cart_Design.pdf1 pages
2 agency-portal links
More from this agency
- Property Cleanup and Debris Removal at 518 Cumberland Ave · closes Dec 7, 2026
- Bolin Road Reconstruction · closes Dec 10, 2026
Closing soon near North Augusta
- Purchase of Certified Playground Safety Mulch · Aiken · closes Dec 1, 2026
- Aiken County Library Phase IV Renovations · Aiken · closes Dec 1, 2026
- FCI Edgefield - FY27 2nd Quarter Bread Requirements · Edgefield · closes Dec 4, 2026
- FCI Edgefield - 2nd Quarter Religious Diet and Halal Food Requirements · Edgefield · closes Dec 4, 2026
- FCI Edgefield - FY27 2nd Quarter Dairy Requirements · Edgefield · closes Dec 4, 2026