GPC - Multi-Building Door Replacement
Department of Health Services — Department of Administration — Division of Facilities Development (DFD)Chippewa Falls, Chippewa, Wisconsin#25F1A
The work includes removal and replacement of doors, frames, glazing, and hardware, with specific requirements for Corbin Russwin locks, Securiton power transfers, Sargent exit devices, and Software House iStar access control. The project is being let using a single prime contracting process, with MEP work bid separately first. A 10% bid guarantee is required. A non-mandatory pre-bid tour is scheduled for October 28, 2026, at 1:00 PM.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 3, 2026, 6:00 AM CT
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- eBuilder Bidding Portal, US Mail, Third-party delivery (UPS, FedEx, DHL), Hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 5
Scope of work
- Replace 37 exterior doors across five buildings
- Replace two overhead sectional doors
- Install new door frames, glazing, and hardware
- Install Software House iStar access control system
- Phase work to maintain facility security
Steps to Bid
- 1
Download the bid package, drawings, and specifications from the DFD Projects Bidding website.
- 2
Attend the non-mandatory pre-bid tour on October 28, 2026, at 1:00 PM at Northern Industries. was Oct 28, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Ensure the bid includes a bid bond in the amount of 10% of the bid total.
What you'll need
Submission
EBuilder Bidding Portal, US Mail, Third-party delivery (UPS, FedEx, DHL), Hand delivery
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Replacement of 37 exterior doors and two overhead doors across five buildings at the Northern Wisconsin Center campus. DFD will first bid MEP divisions (mechanical, electrical, plumbing, fire protection) separately. Successful MEP bidders must be included in all general prime contractor bids. The general prime contractor bid will be opened after the MEP bids are identified. Bid opening will be conducted via Microsoft Teams. A non-mandatory pre-bid tour is scheduled for October 28, 2026, at 1:00 PM at Northern Industries in the Wisconsin Conference room. The project is being managed by the Division of Facilities Development (DFD) for the Department of Health Services.
Key dates
- Pre-bid meeting
- Oct 28, 2026, 1:00 PM Central Time
- Bids due
- Dec 3, 2026, 6:00 AM CT
Documents
- 25F1A_GPC_A-1_Document.pdf2 pages
- 25F1A_GPC_TOC.pdf4 pages
- 25F1A_MEP_A-1_Document.pdf2 pages
- 25F1A_MEP_TOC.pdf4 pages
- 25F1A_Spec_Vol_2_TOC.pdf3 pages
More from this agency
- MEP - Renovate North Building Elevator — closes Dec 2, 2026
- Multi-Building Security Core Renovation – Secure Treatment Facility Mauston — closes Dec 3, 2026
- High Mast Lighting Replacement at Wisconsin Resource Center — closes Dec 8, 2026
- Fire Alarm System Upgrades at Winnebago Mental Health Institute — closes Dec 15, 2026
- Renovate North Building Elevator – Wisconsin Resource Center — closes Dec 16, 2026
Similar open bids
- REQUEST FOR BIDS: REBID CAMP STORE — City of Evansville
Closing this week nearby
- BPA Call Order Exceeding $20,000 Synopsis 1175241 — closes Nov 18, 2026
- Good Shepherd Lutheran School: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (Existing Equipment) — closes Nov 18, 2026
- Pre-Construction Site Preparation – Time Restricted – Boys & Girls Club — closes Nov 18, 2026
- New Warehouse Construction at Prairie Du Chien Correctional Facility — closes Nov 19, 2026
- Maintenance Building Remodel Phase II — Roofing, Stucco, Window, and Fire Alarm System Rehabilitation — closes Nov 19, 2026