OpenRFPCloses Dec 2, 2026

Gravity Sewer Replacement South Zone 1

City of Tybee IslandTybee Island, Georgia#ITB2026-114

Work must be substantially completed within 120 days and fully completed within 150 days after the notice to proceed. A bid bond of 5% of the total contract amount is required. Responses will be distributed by 5:00 PM on Friday, November 20, 2026.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery, courier
Contract term
one-time contract
Documents analyzed
3 published · 1 analyzed

Scope of work

  • Replace 2,000 linear feet of 8-inch PVC gravity sewer piping
  • Install new sanitary sewer manholes
  • Connect to existing sewer mains and manholes
  • Abandon existing 4-inch and 8-inch sewer mains with flowable fill
  • Remove and replace asphalt pavement
  • Install stone bedding and sand backfill

Steps to Bid

  1. 1

    Obtain plans and specifications from Thomas & Hutton Engineering Co. at 50 Park of Commerce Way, Savannah, GA 31405, for $200.00 (hard copy) or $25.00 (digital copy). Contact Ms. Karen Smulski at (912) 234–5300 or [email available with Pro].

  2. 2

    Review all addenda posted on the City’s website at Official linkPro. Bidders must acknowledge each addendum in the bid.

  3. 3

    Prepare the bid package using the enclosed forms, including all required attachments.

What you'll need

Contract duration

120 days after the notice to proceed

Submission

Mail, Hand delivery, Courier

NAICS

237130, 237199

How to submit

One original and one electronic copy (USB flash drive) must be submitted in a sealed opaque envelope, plainly marked with the ITB number and title, and bidder’s company name.

In person/mail: ALEESHA ROBINSON, CITY HALL, 403 BUTLER AVE, TYBEE ISLAND, GA. 31328

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves installation of approximately 2,000 linear feet of new 8-inch PVC gravity sewer piping at varying depths, installation of new sanitary sewer manholes, connections to existing sewer mains and manholes, abandonment of existing 4-inch and 8-inch sewer mains using flowable fill, removal and replacement of existing asphalt pavement, stone bedding, sand backfill, erosion and sediment control measures, and other incidental construction. The Contractor is responsible for maintaining existing sanitary sewer service and providing temporary wastewater bypass pumping or other approved means of flow management to prevent service interruptions and overflows.

Key dates

Questions due
Nov 18, 2026, 5:00 PM Eastern Time
Pre-bid meeting
Nov 16, 2026, 11:00 AM Eastern Time
Bids due
Dec 2, 2026

Documents

  • ITB2026-114 Gravity Sewer Replacement South Zone 1.pdf22 pages
  • ITB 2026-114 - SS Replacement South Zone 1 Bid Set.pdf
  • ITB 2026-114 - Complete Full Set Specificationa - Zone 1.pdf

See all documents · Download with Pro

Similar open bids

Closing this week nearby