Gravity Sewer Replacement South Zone 1
City of Tybee IslandTybee Island, Georgia#ITB2026-114
Work must be substantially completed within 120 days and fully completed within 150 days after the notice to proceed. A bid bond of 5% of the total contract amount is required. Responses will be distributed by 5:00 PM on Friday, November 20, 2026.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery, courier
- Contract term
- one-time contract
- Documents analyzed
- 3 published · 1 analyzed
Scope of work
- Replace 2,000 linear feet of 8-inch PVC gravity sewer piping
- Install new sanitary sewer manholes
- Connect to existing sewer mains and manholes
- Abandon existing 4-inch and 8-inch sewer mains with flowable fill
- Remove and replace asphalt pavement
- Install stone bedding and sand backfill
Steps to Bid
- 1
Obtain plans and specifications from Thomas & Hutton Engineering Co. at 50 Park of Commerce Way, Savannah, GA 31405, for $200.00 (hard copy) or $25.00 (digital copy). Contact Ms. Karen Smulski at (912) 234–5300 or [email available with Pro].
- 2
Review all addenda posted on the City’s website at Official linkPro. Bidders must acknowledge each addendum in the bid.
- 3
Prepare the bid package using the enclosed forms, including all required attachments.
What you'll need
Contract duration
120 days after the notice to proceed
Submission
Mail, Hand delivery, Courier
NAICS
237130, 237199
How to submit
One original and one electronic copy (USB flash drive) must be submitted in a sealed opaque envelope, plainly marked with the ITB number and title, and bidder’s company name.
In person/mail: ALEESHA ROBINSON, CITY HALL, 403 BUTLER AVE, TYBEE ISLAND, GA. 31328
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project involves installation of approximately 2,000 linear feet of new 8-inch PVC gravity sewer piping at varying depths, installation of new sanitary sewer manholes, connections to existing sewer mains and manholes, abandonment of existing 4-inch and 8-inch sewer mains using flowable fill, removal and replacement of existing asphalt pavement, stone bedding, sand backfill, erosion and sediment control measures, and other incidental construction. The Contractor is responsible for maintaining existing sanitary sewer service and providing temporary wastewater bypass pumping or other approved means of flow management to prevent service interruptions and overflows.
Key dates
- Questions due
- Nov 18, 2026, 5:00 PM Eastern Time
- Pre-bid meeting
- Nov 16, 2026, 11:00 AM Eastern Time
- Bids due
- Dec 2, 2026
Documents
- ITB2026-114 Gravity Sewer Replacement South Zone 1.pdf22 pages
- ITB 2026-114 - SS Replacement South Zone 1 Bid Set.pdf
- ITB 2026-114 - Complete Full Set Specificationa - Zone 1.pdf
Similar open bids
- Gravity Sewer Replacement South Zone 1, Tybee Island, GA — Tybee Island, City Of
- Professional Emergency Repair Services for On-Call Water, Sanitary Sewer, and Stormwater — City of Canton
- Emergency Repair Services for Water and Sewer Mains on an Annual Contract — Gwinnett County Government
- On-Call Emergency Repair Services for Water, Sanitary Sewer, and Stormwater Systems — Canton, City Of
- Purchase and Start-Up of Submersible Pumps for Wastewater Pump Stations — Gwinnett County Government
Closing this week nearby
- Generator Set, Diesel (NSN 6115016275690) — closes Nov 19, 2026
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Drainage Materials Procurement — ITB-DRAINAGE-MATERIAL — closes Nov 19, 2026
- Bartram Trail Regional Library System: E-Rate FY2027 Internet Access and Data Transmission Service — closes Nov 19, 2026