Grawemeyer Switchgear Replacement & New Building
University of LouisvilleLouisville, Kentucky#1209010
This project involves constructing a new, climate-controlled switchgear building and installing an electrical duct bank with associated conduit. All excavation and underground utility work must occur during the summer break (May 15th - first week of August), with building construction continuing until November. Traffic flow and parking access must be maintained throughout the project. The bid requires a project schedule, and temporary power must be provided by the contractor during shutdowns. The bid due date is January 5, 2027, at 2:00 PM EST. A mandatory pre-bid meeting with a site walk is scheduled for December 1, 2026, at 1:00 PM EST at the Miller Information Technology Center (MITC). Written questions are due by December 7, 2026, at 2:00 PM EST. A bid bond of 5% of the bid amount is required. Performance and Payment Bonds are also required.
On PublicBidSearch: the original bid posting, 16 bid documents and the agency contact (email) for this bid.
Contact
Agency contact for this bidEmail — included with ProProOverview
- Due
- Jan 5, 2027
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Documents analyzed
- 16 published · 12 analyzed
Scope of work
- Rework of LG&E Algonquin Service, including restoration of asphalt, brick pavers, curbing, sidewalks, landscaping, and lawn areas.
- Installation of Silt Fence as per MSD requirements.
- All trenching, excavation, underground utilities, and conduits installation must be accomplished during the summer break (May 15th – 1st week of August).
- Traffic flow over the Oval driveway and parking lot drive lanes must be maintained; open trenches must be metal-plated.
Steps to Bid
- 1
Review Bid Documents, Instructions to Bidders, and Terms and Conditions.
- 2
Submit Written Questions. by Dec 7, 2026, 2:00 PM
Questions must be submitted via the University bidding platform Workday.
- 3
Review Addendum for Questions (if issued). by Dec 14, 2026, 2:00 PM
What you'll need
Bid security
RequiredPerformance and Payment Bonds are required per 200KAR 5:305 Section 1. Failure to provide will result in loss of award of contract. 100% P&P Bonds are required when signing a contract.
Contract duration
Substantial Completion Date: 11/23/2027, Final Completion Date: 11/30/2027
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Construction of a new switchgear building to house new medium voltage switchgear serving as a major junction in the underground distribution network on campus and Grawemeyer Hall. A cubic yard rate for over-excavation and backfill of unsuitable soils and materials at the location of the new building is required. A KYTC encroachment permit will be required for any utility work in the 3rd street state highway right-of-way. A MSD plan submission and permits are required. Pre-ordered equipment (Exhibit I) is provided for reference only for installation of Electrical gear’s concrete pads and underground feeders to electrical equipment. This equipment is stored in the owner's warehouse less than 2 miles from Belknap campus; the awarded contractor shall inspect and ship equipment to site. Equipment includes: 15KV, MV Switchgear- Indoor (Qty.1), 15KV, MV Metering Switchgear- Outdoor (Qty.1), 500KVA, 13.8kv- 208Y/120V LV Transformer – Indoor (Qty.1), MDP,1600A, 208Y/120V,3Ph, Grawemeyer Switchboard – Indoor (Qty.1). Contractor shall provide a project schedule with key milestones identified, power shutdown requirements, and completion dates. Contractor to coordinate any shutdown period with Physical Plant. The contractor is required to provide temp power using portable generators to the buildings affected by the shutdown. However, the Switchgear building construction can resume until November. All open trenches that fall within the Oval Driveway path and parking drive lanes must be metal-plated to ensure safe traffic. A Flagger must be present during construction to direct traffic during excavation work when any of the lane/s is closed during business hours; detour and construction sign/s shall be located. The Grawemeyer Hall Parking area must be available for use by the occupants of Grawemeyer Hall and surrounding buildings. Cover work-in-place for accessibility. A 48-hour notice is required from Belknap Work Control for work within the Grawemeyer Hall parking area that would restrict or prohibit parking.
Key dates
- Questions due
- Dec 7, 2026, 2:00 PM Eastern Time
- Pre-bid meeting
- Dec 1, 2026, 1:00 PM Eastern Time · Mandatory
- Bids due
- Jan 5, 2027
Documents
- IB__1209010_Grawemeyer_Switchgear_Replacement_and_New_Building.pdf24 pages
- Exhibit_O_Workers_Comp_Affidavit.docx
- Exhibit_N_Payment_and_Performance_Bond_Template.docx
- Exhibit_M_Sample_Contract_for_reference_only_.pdf39 pages
- Exhibit_L_Unit_Pricing.pdf
- Exhibit_K_Alternates.pdf1 pages
- Exhibit_J_Cost_Breakout_Worksheet.pdf1 pages
- Exhibit_I_Electrical_Pre-Purchased_Submittals.pdf
8 more files
Similar bids near Louisville
- Bid 26-83 / 690 Plan HCWD#2 Phase 1 Minor Lane Area PRV Installation Bid Package #7 · Louisville · closes Dec 9, 2026
- / Project 17180 / 690 Plan HCWD#2 Phase 1 Minor Lane Area PRV Installation Bid Package #7 · Louisville · closes Dec 9, 2026
- Newburg Community Center Gym Construction Project · Louisville · closes Dec 4, 2026
- Interior Renovation of CHFS - HZLD Facility · Louisville · closes Dec 9, 2026
- Addendum 2 to Invitation to Bid: Training Facility Documents — Bid Date Extended to December 4, 2026, at 1:00 PM · Middletown
Closing soon near Louisville
- Glock Pistols and Accessories · Louisville · closes Nov 30, 2026
- Communication Franchise November 2026 · Louisville · closes Nov 30, 2026
- Phase 3 Entrance Improvements for FY2027 · Hurstbourne · closes Nov 30, 2026
- Bluegrass Parkway Bicycle and Pedestrian Trail – Phase II · Jeffersontown · closes Dec 2, 2026
- Temporary Staffing Provider · Louisville · closes Dec 4, 2026