OpenIFBCloses Dec 22, 2026

Green Stormwater Infrastructure and Drainage Improvements Project

Town of Los Gatos — Parks and Public WorksLos Gatos, California#27-PPW-008

The Town of Los Gatos is soliciting proposals from qualified civil engineering consultants to design drainage improvements and green stormwater infrastructure (GSI) at the Parks and Public Works (PPW) facility and adjacent areas. Scope includes topographic survey, assessment of existing drainage, evaluation and sizing of GSI facilities, alternative analysis, and development of a preferred concept, preliminary design plans, and construction cost estimates. Project completion is tentatively scheduled for preliminary design by April 2027, final design by December 2027, and construction start in March 2028. The project may be adjusted based on permitting, funding, and site conditions. Bidders must be qualified civil engineering consultants.

On PublicBidSearch: the original bid posting for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 22, 2026
Time stated in bid documents
Dec 22, 2026, 5:00 PM Pacific Time

Scope of work

  • Assess stormwater runoff from roofs, parking, Corp Yard, ball field, and streets
  • Investigate drainage deficiencies and flooding at ball field and adjacent parking
  • Prepare preliminary design and cost estimate by April 2027

Steps to Bid

  1. 1

    Prepare and submit a proposal including qualifications, experience, and technical approach. by Dec 22, 2026, 5:00 PM

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project will evaluate opportunities to capture and treat stormwater runoff from building roofs, paved parking and Corp Yard areas, the adjacent ball field and parking lot, and nearby streets where appropriate. The selected consultant will perform a topographic survey, assess existing drainage conditions, evaluate and size potential GSI facilities, develop and compare alternatives, and prepare a preferred concept, preliminary design plans, and construction cost estimates. The tentative schedule is to complete preliminary design and rough order of magnitude cost estimate by April 2027, complete final design for the GSI improvements by December 2027, and begin construction in March 2028. Drainage improvements may be designed and built under a separate timeline depending on the complexity.

Key dates

Bids due
Dec 22, 2026

More from this agency

Similar bids near Los Gatos

Closing soon near Los Gatos