Grid Supply Chain Alternatives to Lead Energy Dominance (SCALED)
National Energy Technology Laboratory — DOE-NETLNationwide (Federal)#DE-FOA-0003641
The Department of Energy (DOE), Office of Electricity (OE), is seeking applications for the Grid Supply Chain Alternatives to Lead Energy Dominance (SCALED) initiative, a program designed to enhance the domestic supply chain for critical electric grid components. The initiative aims to bolster domestic capabilities to withstand supply chain shocks, ensure a reliable energy infrastructure, and position the U.S. as a global leader in foundational grid technologies. The program seeks to reduce reliance on vulnerable foreign-dominated supply chains, expand U.S. production capacity, shorten procurement lead times, and accelerate deployment of resilient grid assets. Topic Area 1, Refurbishment and Reuse of Critical Grid Equipment, has $50 million available for projects ranging from $2.5 million to $15 million, requiring a minimum 50% cost share and up to a 24-month project period. Topic Area 2, Alternative Materials and Subcomponents, has $187 million available for projects ranging from $1 million to $25 million, also requiring a minimum 50% cost share and up to a 48-month project period. Foreign entities may participate with a waiver. All work must be performed in the U.S. The application process includes a concept paper submission followed by a full application. The concept paper is due November 20, 2026, and the full application is due February 8, 2027.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Feb 8, 2027
- Submission
- electronic portal
- Documents analyzed
- 4 published · 2 analyzed
Steps to Bid
- 1
Register in Official linkPro and obtain a Unique Entity Identifier (UEI).
This is a one-time action and may take several weeks. Ensure registration is active and up to date.
- 2
Register in DOE's eXCHANGE site.
This is a one-time action. Each organization should use only one account.
- 3
Submit Concept Paper. was Nov 20, 2026, 5:00 PM
This date has passed — confirm eligibility with the agency before bidding.
Must be submitted by the specified due date and time to be eligible to submit an application. Each concept paper must be limited to a single concept, technology, or project and must not exceed 7 pages, not including references.
- 4
Submit Full Application.
Must be submitted by the specified due date and time to be eligible for comprehensive merit review. Applicants are strongly encouraged to submit all required application documents at least 48 hours before the submission deadline.
What you'll need
Contract duration
Topic Area One (1): Oct. 2027 – Sept. 2029; Topic Area Two (2): Phase 1: Oct. 2027 – Sept. 2028, Phase 2: Oct. 2028 – Sept. 2031
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The program seeks to enhance the domestic supply chain for critical electric grid components such as distribution transformers, larger power transformers, circuit breakers, switchgear, reclosers, insulators, busbars, and high-voltage bushings. It aims to bolster domestic capabilities and capacity to handle supply chain shocks, complement ongoing investments in domestic manufacturing capacity, and strengthen supply chains for next-generation grid components. The program purpose is to strengthen the Nation’s energy security and energy dominance by building a more resilient, flexible, and domestically anchored supply chain for critical electric grid components. The purpose is to reduce vulnerabilities in the current grid supply chain landscape by expanding U.S. capabilities across refurbishment and recycling as well as the production, integration, and adoption of alternative materials and subcomponents. Topic Area 1 focuses on increasing inventory and availability of critical grid equipment by identifying opportunities for utilities, or other users of electric grid transmission and distribution equipment, to enhance efforts to refurbish equipment and/or reclaim subcomponents and materials from components taken out of service. Topic Area 2 focuses on providing support for U.S. suppliers and manufacturers in identifying, qualifying, integrating, and adopting alternative materials and subcomponents, or other domestically sourced material and subcomponents, to reduce bottlenecks and strengthen domestic supply chains for critical grid components. Awards are cooperative agreements.
Key dates
- Bids due
- Feb 8, 2027
- Expected award
- Sep 23, 2027
Documents
- FundOpp_DE-FOA-0003641.pdf51 pages
- DE-FOA-0003641_SCALED_NOFO_Part_2.pdf47 pages
- exchange.energy.gov
- DE-FOA-0003641_SCALED_NOFO_Part_1_Modification_000001.pdf53 pages
Similar bids nearby
- Silcon Carbide Cladding Lead Test Rod Development-Phase 1 · closes Dec 7, 2026
- Hancock County PY24 Ordered Demolitions · closes Dec 8, 2026
- Lead, Test - NSN 6625-01-496-9913 · closes Dec 9, 2026
- Lead, Test (NSN: 6625-01-498-9988) · closes Dec 4, 2026
- Catalyze: Product Definition for Small Molecules, Biologics and Combination Products - Target Identification and… · closes Dec 23, 2027
Closing soon nearby
- Spring, Helical, Compression - NSN 5360-01-173-4982 · closes Nov 30, 2026
- Control Stick, Aircraft (NSN: 1680-01-480-5075) · closes Dec 1, 2026
- FLOOR, AIRCRAFT (NSN: 1560-01-480-5048) · closes Dec 1, 2026
- Flywheel, Engine (NSN: 2805-01-576-1454) · closes Dec 2, 2026
- BEARING, SLEEVE · closes Dec 4, 2026