OpenRFPCloses Nov 30, 2026, 11:00 AM CT

Fire Dampers Inspection and Testing Services

Department of Veterans Affairs — 256-NETWORK CONTRACT OFFICE 16 (36C256)Mississippi#36C25627Q0151

This solicitation is for Fire Dampers Inspection and Testing Services at the Biloxi VA Campus. The service includes inspecting and testing 247 fire dampers across multiple buildings within 90 days of the Notice to Proceed. Services include locating, operating, cleaning, and testing dampers, replacing fusible links, and documenting all findings. Repairs beyond fusible links require prior written approval. The contract period is from 12/31/2026 to 12/30/2027. The solicitation is set aside for Certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Bidders must be certified and listed in the SBA certification database. Questions are due by November 25, 2026, at 12:00 PM ET.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 30, 2026, 11:00 AM CT
Submission
email
Contract term
12/31/2026 – 12/30/2027
Documents analyzed
6
Required submission items
7 items · full checklist with Pro

Scope of work

  • Replace damaged fusible links with matching specifications.
  • Update drawings with damper locations per NFPA guidelines.
  • Provide detailed inspection reports with photos and pass/fail status.
  • Furnish red-lined AutoCAD/PDF drawings and organized pictures on CD.
  • Perform necessary repairs to damper linkages and components.

Steps to Bid

  1. 1

    Submit all questions via email to [email available with Pro] with a copy to [email available with Pro]. No phone calls will be accepted for questions. by Nov 25, 2026, 12:00 PM

    Questions must be submitted via email only.

  2. 2

    Submit all solicitation responses/packages via email to [email available with Pro] with a copy to Tina Harris at [email available with Pro].

    Quotes must be submitted electronically and will not be accepted through fax or postal mail.

What you'll need

Contract duration

90 days following the Notice to Proceed

Submission

Email

NAICS

541350

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 7-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The intent of this one-time service is to inspect and test multiple building’s Fire Dampers (247 dampers) for regulatory compliance on the Biloxi VA Campus as described below within the 90 days following the Notice to Proceed. The 247 Fire Dampers for inspection and testing are in the Patient Buildings of 3, 30, 14, 15, and 25 and the Non-Patient Buildings of 1, 2, 5, 19, and 28 on the Biloxi VAMC Campus. All painted or damaged fusible links must be replaced with a link of same size, temperature, and load rating. The location of each fire damper and access panel to be verified on each drawing and then updated on each drawing in accordance with NFPA guidelines. All inspected fire dampers must have a visible label that corresponds to an Item number on the list, inspection date, condition, and inspector. Each building inspected will have its own inspection documentation with 2 pictures minimum per damper showing damper itself and general comments affecting damper operation. Each damper on the final report at a minimum shall state Pass / Fail. Contractor shall furnish within the 90 days, the red-lined AutoCAD 2000 / Adobe PDF drawing for each building on a CD and on 11” x 17” sheet. All pictures taken are to be labeled, organized by building and floor, and provided on a CD. Contractor shall furnish a formal Fire Damper Report on CD by building of all dampers inspected with inspectors signature. All work shall be done in accordance with the current National Fire Protection Agency (NFPA) Code requirements. The Joint Commission, the latest applicable National Fire Protection Association (NFPA) standards, and Occupational Safety and Health Administration (OSHA) regulatory requirements. Testing is specific to 4 year frequency test for fire pump/smoke pump in facility. NFPA 80 – Standard for Fire Doors and Other Opening Protectives. NFPA 90A – Standard for the Installation of Air Conditioning and Ventilating Systems. NFPA 101 – Life Safety Code. NFPA 105 – Standard for Smoke Door Assemblies and Other Opening Protectives. NFPA 5000 – Building Construction & Safety Code. Contractor shall furnish all labor, tools, and equipment to inspect fire and smoke dampers at Biloxi VAMC Campus. Use commercially reasonable efforts to locate and, once located, operate all dampers provided in list by Contracting Officer’s Representative (COR) upon commencement of inspection. Include documentation of all tested devices and must identify as a minimum which includes date inspected, unique device identification, device location, status (Pass or Fail), the type and quantity of devices tested in each building, and a consolidated deficiency finding list per building. Coordinate with the COR, Air Conditioning Equipment Mechanic, Electronics Mechanic and notify local fire department that the fire alarm system is in “test mode” due to the inspection of the smoke and/or combination dampers. Locate, access and survey area of dampers. Clear each damper of any debris that would impede such dampers normal operation. Check for penetrations. Ensure no interference to operation due to: (rusted, bent, misaligned, or damaged frame or blades, or defective hinges or other moving parts). Inspect all linkage and pivot points for freedom of movement and condition. Manually activate actuators on electric smoke and/or combination dampers to verify proper operation. Lubricate all moving parts on each damper. Check operation of the latch if damper is provided with a latch. Reset fusible links on fire dampers, to verify such fire damper fully closes and if necessary, replace any fusible link that is compromised (per NFPA code requirements). Replace springs and/or access handles for the fire/smoke dampers as necessary. Identify each unidentified unit location with a ceiling grid damper label. Identify on drawings the location of each damper, along with placement of identification stickers on ceilings or other location to assist in future location of such dampers; Authenticate compliance utilizing a customized Universal Product Code (UPC) label applied directly to all damper units, specifying reference number and inspection date. Create a comprehensive inventory and repair list for all inspected damper locations. Thoroughly clean all areas with a high-density high efficiency particulate air (HEPA) filtration system. Complete all pertinent damper unit repairs as deemed necessary (linkage adjustments, damper unit mounts, flex installations). Contractor shall be able to perform such repair or replacement if dampers are in need of either replacement or repair, the scope of repair or replacement shall be determined by the project manager and/or contractor technician. A list of defective dampers shall be generated by the contractor and provided to the COR and Contracting Officer for approval.

Key dates

Questions due
Nov 25, 2026, 12:00 PM Central Time
Bids due
Nov 30, 2026, 11:00 AM CT

Documents

  • Attachment_5_Solicitation_Questions_Request_Form.docx
  • Attachment_4_Contractor_Certification.docx
  • Attachment_3_Past_Performance_Questionnaire.docx
  • Attachment_2_List_of_Past_Performance_References.docx
  • Attachment_1_Harrison_County_WD_15-5147_Rev_31_dated_8-11-2026.docx
  • 36C25627Q0151.docx

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby