Harney County Well Repair
Water Resources DepartmentOregon#S-69000-00014973
This Request for Proposals (RFP) seeks proposals for the repair and alteration of the Dunn Ranch Well#1 in Harney County, Oregon, to convert it into an observation well for long-term groundwater level monitoring. The work must comply with Oregon state regulations for well construction and abandonment. Key tasks include installing new 6-inch casing, filter pack, and annular seals, as well as constructing an insulated surface completion. The project site is on Malheur National Wildlife Refuge property. Bidders must be licensed Oregon well drillers. No pre-proposal conference will be held. All inquiries must be submitted by November 17, 2026, at 8:00 AM Pacific Time.
On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 10, 2026
- Submission
- electronic portal
- Contract term
- December 31, 2027
- Documents analyzed
- 7
Scope of work
- Alter and repair existing artesian well (HARN 1455 – Dunn Ranch Well #1)
- Construct insulated surface completion with instrument-compatible well head
- Perform inflatable packer test to determine final seal depth
Steps to Bid
What you'll need
Contract duration
upon the completion of this Project
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
All work shall comply with OAR Chapter 690, ORS Chapter 537, and applicable well construction and abandonment standards. The work includes installing perforated 6 inch casing from the final seal depth (proposed at 220 feet; contingent on packer test results) to the total well depth (525 feet), installing a filter pack at the perforated interval, installing new 6 inch steel casing inside the existing 12 inch casing and open borehole, constructing a continuous seal to the final seal depth (proposed at 220 feet; contingent on packer test results), installing a new surface seal from land surface to at least 18 feet, and installing an insulated surface completion and instrument-compatible well head. The site is located on Malheur National Wildlife Refuge property accessible under agreement between the landowner and OWRD. Access to the sites is via paved and gravel roads seasonally suitable for truck-mounted drilling equipment. Latitude/Longitude: 43.26139340, -119.01447723. Township/Range/Section: 27S/30E 4 NW-NW. No site access or field activities shall begin until Refuge staff have been notified and any access guidance or restrictions issued by the Refuge have been communicated and understood. The Proposer shall comply with all access conditions established by the Refuge. There is no access to utilities at the proposed site (water, power, restrooms, etc.). The Proposer will be responsible for providing all supporting services and supplies required to complete the project scope and will remove all unused and waste materials from the site after completion of the work. The Proposer will make all reasonable efforts to minimize impact to the landscape by drilling and related heavy equipment and due to drilling activities. At the completion of the project, the ground surface and landscape surrounding the well will be returned to a state substantially similar to that present before mobilization to the site. The site is located within an area that periodically experiences flooding and saturated ground conditions. As a result, site access may at times be restricted or unsafe for heavy equipment. If flooding, road washouts, saturated soils, or other environmental conditions prevent safe access to the site, the Proposer shall immediately notify OWRD. OWRD or the Proposer may temporarily suspend or postpone site work when, in their judgment, conditions are unsafe or unsuitable for access or field operations. When access limitations occur due to flooding or similar unforeseen site conditions: The Proposer shall not mobilize equipment until OWRD and the Proposer mutually agree that site access is safe and suitable for mobilization; The project schedule may be adjusted by mutual agreement to accommodate safe entry to the site; Delays caused by such conditions shall not be considered nonperformance by the Proposer; Additional mobilization, demobilization, or standby costs, if any, must be identified in the Proposer’s bid table and will only be paid if applicable and pre-approved by OWRD. Work shall resume once OWRD, in coordination with the Proposer, determines that site access and ground conditions are suitable for safe and effective operations.
Key dates
- Questions due
- Nov 17, 2026, 8:00 AM Pacific Time
- Bids due
- Dec 10, 2026
- Expected award
- Dec 18, 2026
Documents
- S-69000-00014973_-_RFP_-_Harney_County_Well_Repair.pdf38 pages
- Attachment_A_-_Sample_Services_Contract_17.docx
- Attachment_B_-_Disclosure_Exemption_Affidavit_18.docx
- Attachment_C_-_Proposer_Information_and_Certification_Sheet_16.docx
- Attachment_D_-_Reference_Check_Form_15.docx
- Attachment_F_-_COBID_Certification_Outreach_Plan_15.docx
- Attachment_G_-_Responsibility_Inquiry_15.docx
Similar open bids
- 3417--VR&E Laser equipment acquisition for Veteran — VETERANS AFFAIRS, DEPARTMENT OF
- Office Renovations at the National Weather Service (NWS) Weather Forecast Office (WFO) LIX in Slidell, LA — NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- ODF Klamath Falls - Fire Cache Replacement — DAS On-Behalf Of
- Fitness Equipment Service & Maintenance for 10 Multnomah County Fitness Centers — Multnomah County
- Contractor Pool for Fuels Reduction and Habitat Restoration, Stockton Oak Project, White River Wildlife Area — Wasco County Soil & Water Conservation District
Closing this week nearby
- Request for Proposals: Engineering Services for the City of Metolius, Oregon — closes Nov 20, 2026
- Mass Care Asset Assessment and System Improvement Plan — closes Nov 20, 2026
- 2027 Stand Exams — closes Nov 20, 2026
- Surface Water Treatment Facility Operation — closes Nov 20, 2026
- Sewer Lining Rehabilitation for 2,500 Linear Feet of Sanitary Sewer Pipe — closes Nov 20, 2026