Harvest Park Phase 2 Implementation
City of MaplewoodMaplewood, Minnesota#10400487
The City of Maplewood is soliciting bids for the construction of a new parking lot and renovated playing courts at Harvest Park, including site utilities, earthwork, landscaping, lighting, and related work. The scope includes approximately 920 LF PVC conduit, 22,835 SF bituminous paving removal, 1.3 acres of site grading, 975 LCY Class 5 subgrade, 2,650 LCY select granular fill, 11,810 SF netless blanket, 1,670 SY bituminous pavement, 890 SF bituminous trail, 2,300 SY sport court, 960 LF curb and gutter, 580 LF concrete maintenance strip, 3,000 SF 4-inch concrete walk, 400 LF 4-foot fence, 670 LF 10-foot fences, 3 shelters, 3,180 SF detention basin, 26,451 SF ground cover (lawn sod), 385 LF RCP storm, and 830 LF perforated drain tile at curb. A bike skills course is an optional alternate. Bids must be submitted online via Quest CDN by 10:00 AM on December 3, 2026. No public bid opening will be held. Bidding documents are available at no cost on the City’s website and at [link available with Pro].
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Dec 3, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 3, 2026, 10:00 AM Central Time
- Submission
- online portal
Steps to Bid
- 1
Review the bid documents available at Official linkPro (click 'Bidding' at the bottom) or at Official linkPro, Project Number 10400487.
- 2
Download and review the full bid documents, including specifications, drawings, and instructions to bidders.
- 3
Submit the bid electronically through the Quest CDN portal by 10:00 AM local standard time on December 3, 2026. by Dec 3, 2026, 10:00 AM
What you'll need
Submission
Online portal
NAICS
236220, 238290, 238990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The City of Maplewood is seeking bids from qualified contractors for the Harvest Park Phase 2 Implementation project, located in Maplewood, Minnesota. A bike skills course and associated fine grading, landscaping, and site amenities will be provided as an additional alternate. The project includes, but is not limited to, the following approximate quantities: 920 linear feet of PVC conduit to pole lights; 22,835 square feet of bituminous paving removal; 1.3 acres of site grading; 975 cubic yards of Class 5 subgrade; 2,650 cubic yards of select granular fill; 11,810 square feet of netless blanket; 1,670 square yards of bituminous pavement; 890 square feet of bituminous trail; 2,300 square yards of sport court; 960 linear feet of curb and gutter; 580 linear feet of concrete maintenance strip; 3,000 square feet of 4-inch concrete walk; 400 linear feet of 4-foot fence; 670 linear feet of 10-foot fences; 3 units of 16 x 7 shelters; 3,180 square feet of detention basin; 26,451 square feet of ground cover (lawn sod); 385 linear feet of RCP storm; 830 linear feet of perforated drain tile at curb. Bids will be received online through Quest CDN until 10:00 AM local standard time on December 3, 2026. Bidding documents are available for free viewing at [link available with Pro] (click 'Bidding' at the bottom of the page) or at [link available with Pro], Quest Project Number 10400487. To be considered a plan holder, documents may be downloaded.
Key dates
- Bids due
- Dec 3, 2026, 10:00 AM CT
More from this agency
Similar open bids
- Big Spunk Rest Area Parking Lot Replacement & Expansion — Minnesota DOT
- Thunder Bay Park Boardwalk Replacement — City of Little Canada
- Replacement of Bridge 7731 (County Bridge 478) with Precast Concrete Box Culverts and Approach Road Work on CSAH 61 — St. Louis County
- Parking Lot Reconstruction at St. Louis County Public Works - Cook Campus — St. Louis County
- CSAH 10 Pavement Rehabilitation — CP 2210404, SAP 027-610-036 — Hennepin County
Closing this week nearby
- General Engineering Consultant (GEC) for Preconstruction Services Master Contract — closes Nov 19, 2026
- Alternative Cementitious and Re-Recycled Materials in Concrete Pavements Research — closes Nov 19, 2026
- Construction Communications, Engagement & Business Outreach for Robert Street Reconstruction Project — closes Nov 19, 2026
- Clean River Partners - Cannon River Fish Passage Improvements — closes Nov 20, 2026
- Designation of Official Newspaper for 2027 — Redwood County, MN — closes Nov 20, 2026