Headquarters Building (HQB) Mechanical and Electrical Upgrades
Federal Aviation Administration — 6973GH FRANCHISE ACQUISITION SVCSOklahoma City, Oklahoma#6973GH-26-R-00082
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR. Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST PERFORMANCE EVALUATION (REVISED MAY 15, 2026). Amendment 0003 is hereby issued to incorporate Amendment 0003, Attachment 1 - Questions and Answers, Attachment 2 - Addendum 02, Attachment 3 - Asbestos Abatement Information, Attachment 4 - HQB Furniture Information, and Attachment 5 - HQB Requested Photos. Amendment 0004 is hereby issued to remove Pages 1 and 2 of the Original SIR, Solicitation, Offer and Award, and incorporate New Pages 1 and 2, Solicitation, Offer and Award (Construction, Alteration, or Repair) attached. In addition, Amendment 0004 provides New Questions and Answers 160 through 165 (attached), establishes a firm cut-off date for submission of questions and extends the proposal due date to June 5, 2026. NOTE: OFFERORS ARE TO SUBMIT NEWLY INCORPORATED PAGES 1 AND 2, SOLICITATION, OFFER AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR) WITH THEIR PROPOSAL. Amendment 0005 is hereby issued to extend the proposal due date to June 10, 2026. Amendment 0006 is hereby issued to provide Questions and Answers 1 through 192, including new Questions and Answers 166 through 192. The proposal due date remains June 10, 2026.
On PublicBidSearch: the original bid posting, 40 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 4:00 PM CT
- Bid bond
- 20%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic
- Documents analyzed
- 40 published · 25 analyzed
Scope of work
- Mechanical and electrical upgrades to Headquarters Building (HQB-001).
- Building remains partially occupied; contractor must ensure safety and minimize disruption.
- Demolition work permitted during off-hours (6 PM - 6 AM Mon-Fri) and weekends/holidays with approval.
- Utility outages affecting FAA operations require coordination and must occur during off-hours.
- Project phasing eliminated; work to be performed under a single construction contract.
- Asbestos abatement by owner prior to construction.
Steps to Bid
What you'll need
Contract duration
887 days after issuance of Notice to Proceed
Submission
Electronic
NAICS
236220
How to submit
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 9 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This solicitation, SIR 6973GH-26-R-00082, is for Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City, OK. The original solicitation was amended multiple times. Amendment 0007 incorporated Addendum 03, dated June 5, 2026. Amendment 0008 revised Provision L.3 (Relevant Experience and Past Performance) and added Provision L.12 (Technical Acceptable/Unacceptable Evaluation of Key Personnel), requesting revised Cost/Price Proposals. New Volume II Technical Proposals are due December 4, 2026, and Revised Cost/Price Proposals are due December 18, 2026. The building will remain partially occupied during construction, and the contractor must ensure safety barriers, warnings, and temporary lighting, heating, and ventilation are provided to keep occupants safe. Three means of egress from each floor are required to be accessible at all times. Demolition work is permitted between 6:00 PM and 6:00 AM Monday-Friday, and on weekends and holidays with pre-approval. Utility outages affecting FAA operations must be accomplished during Saturdays, Sundays, or designated government holidays with seven (7) working days' notice. The project requires compliance with the Buy American Act. The project was originally designed to include phased efforts, but phasing has been eliminated, and the work will be performed under a single construction contract. The building will be emptied completely, removing the need for project phasing. Furniture may be shifted or relocated, with 7-day notice to the project manager required for any required furniture relocations or disassembly.
Key dates
- Questions due
- Jun 3, 2026, 5:00 PM Central Time
- Pre-bid meeting
- Apr 23, 2026, 1:00 PM Central Time
- Site visit
- Apr 23, 2026, 1:00 PM Central Time
- Bids due
- Dec 4, 2026, 4:00 PM CT
Documents
- Attachment_17_Resume_for_Key_Personnel.pdf2 pages
- Amendment_0008_Attachment_14_Major_Cost_Element_Breakdown.xlsx
- Amendment_0008_Attachment_1_Section_B.xlsx
- L.12_TECHNICAL_ACCEPTABLE_-_UNACCEPTABLE_EVALUATION_OF_KEY_PERSONNEL.pdf1 pages
- Amendment_0008.pdf3 pages
- Addendum_03.pdf2 pages
- Amendment_0007.pdf1 pages
- Updated_QA_Log_6-5-26.pdf
32 more files
More from this agency
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades · closes Dec 4, 2026
- Gulfstream G280 Initial and Recurrent Pilot Qualification Training · closes Dec 7, 2026
- Market Survey for Simulator Training Capability: Gulfstream G650, IA-Jet, and Eclipse EA-500S · closes Dec 16, 2026
- ARSR-4 Collector Power Supply Test Station (CPSTS) Design · closes Dec 18, 2026
Similar bids near Oklahoma City
- Preparation of Construction Plans (Widen & Resurface): SH-51 from 0.25 miles east of US-270 to 5.0 miles east · Oklahoma City · closes Dec 1, 2026
- Preparation of Construction Plans (Grade, Drain, Bridge & Surface) for SH-74 from 164th Street to 192nd Street, ODOT… · Oklahoma City · closes Dec 1, 2026
- Construction Manager at Risk (CMAR) Services for Reding Senior Center and Reding Annex · Oklahoma City · closes Dec 14, 2026
- Preparation of Construction Plans (Intersection Modification): US-259 at SH-3/US-70 Junction · Oklahoma City · closes Dec 1, 2026
- The renovation of existing skylights at the existing Administration building (CAP27-0039) · Oklahoma City · closes Jan 5, 2027
Closing soon near Oklahoma City
- On-Demand On-System Bridge Inspection Services · Oklahoma City · closes Dec 1, 2026
- Alternative Delivery Program Management – Solicitation of Interest · Oklahoma City · closes Dec 1, 2026
- On-Demand Community Engagement Services · Oklahoma City · closes Dec 1, 2026
- Quarterly Subsistence-Bread Procurement for Federal Transfer Center, Oklahoma City, FY2027 Second Quarter · Oklahoma City · closes Dec 4, 2026
- Quarterly Subsistence Milk Supply – Federal Transfer Center, Oklahoma City · Oklahoma City · closes Dec 4, 2026