Highway Department - One (1) New 2027 F550 4-Door Cab Chassis 4 Wheel Drive with Dual Rear Wheels
Shawano County, WIShawano, Wisconsin
on December 8, 2026. Proposals must include manufacturer's detailed specifications. All transportation and delivery costs are the dealer's responsibility. The successful bidder must complete an information sheet and deliver the vehicle within 10 weeks of acceptance.
On PublicBidSearch: the original bid posting and 1 bid document for this bid.
Overview
- Due
- Dec 8, 2026, 8:00 AM CT
- Time stated in bid documents
- Dec 8, 2026, 8:00 AM Central Time
- Submission
- mail, hand delivery
Scope of work
- V-8 7.3L gasoline engine, 10-speed automatic transmission
- Heavy-duty front and rear suspension, 19,000 lb GVWR
- 4.88 rear axle ratio with locking/limited-slip differential
- Steel wheels with 225/70R19.56 all-terrain tires, two spare tires and wheels
- Heavy-duty alternator/battery, 4-door cab body
- Adjustable manual folding mirrors and running boards
Steps to Bid
- 1
Attach manufacturer's full and detailed cuts and specifications for the proposed equipment.
What you'll need
Submission
Mail, Hand delivery
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Proposals will be received up to 8:00 A.M. on Tuesday, December 8th, 2026. All proposals must include manufacturer's full and detailed cuts and specifications. The net price to Shawano County is the price of the equipment equipped as specified, delivered to the county garage. Equipment must be available within 10 weeks of acceptance of the proposal. The delivery date is of prime importance and was considered in the acceptance of the quote. Proposer may submit additional data on letterhead, including names and phone numbers of recent purchasers of like equipment. Any deviations from specifications must be listed on a separate sheet and signed by the dealer. All transportation, delivery, mounting, and warranty costs are the responsibility of the dealer. Proposals must be firm for at least 45 days from the proposal opening date. The County is exempt from Federal Excise Tax, but any tax must be shown in the quotation. The successful quoter will be required to complete an information sheet supplied by the County.
Key dates
- Bids due
- Dec 8, 2026, 8:00 AM CT
Documents
- 11-24-26_2027_f550_truck_chassis_cab_dual_rear_wheels_spec.pdf
More from this agency
- Highway Department - One (1) New CW16 Pneumatic Roller · closes Dec 8, 2026
Closing soon near Shawano
- Combined Locks 2026 Pond Dredging · Combined Locks · closes Dec 1, 2026
- Boiler Replacements at Airport · Green Bay · closes Dec 1, 2026
- Leachate Hauling from South Landfill · Green Bay · closes Dec 1, 2026
- Environmental Monitoring Services · Green Bay · closes Dec 1, 2026
- City of Appleton WTP Boiler Replacement · Appleton · closes Dec 2, 2026