OpenIFBCloses Dec 8, 2026, 2:00 PM CT

Hot Water Pipe Procurement

City of DuluthDuluth, St. Louis, Minnesota#26-0599

Materials must meet EN 253, EN 448, EN 488, EN 489, and EN 14419 standards. Approved manufacturers include Logstor, Isoplus, Brugg/German Pipe, PowerPipe, Bohmer Valves, and Radpol Pipes. Bids must be submitted electronically via Bid Express. The anticipated delivery date is May 28, 2027. The bid form includes line items for multiple pipe sizes, fittings, valves, joint kits, end caps, equipment rental, expansion pads, installer training, and shipping. The vendor must provide a written description of the redundant electro-fusion welding equipment strategy. Installer training is included in the bid. Bids must be firm for at least 60 days.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 8, 2026, 2:00 PM CT
Time stated in bid documents
Dec 8, 2026, 2:00 PM Central Time
Bid bond
5%
Submission
electronic portal
Documents analyzed
3

Scope of work

  • Furnish and deliver pre-insulated steel hot water pipe (60/140MM to 273/450MM)
  • Supply pre-insulated fittings, ball valves, and joint kits
  • Include alarm wiring tools and valve operation tools
  • Deliver expansion foam pads and installer training

Steps to Bid

  1. 1

    Register on Bid Express® and create a free account.

  2. 2

    Download the bid package, specifications, and addenda from Official linkPro.

  3. 3

    Submit questions to [email available with Pro] by Thursday, December 3, 2026, at 4:00 PM CT. by Dec 3, 2026, 4:00 PM

  4. 4

    Complete the bid form and submit electronically via Bid Express by Tuesday, December 8, 2026, at 2:00 PM CT. by Dec 8, 2026, 2:00 PM

What you'll need

Contract duration

May 28, 2027

Submission

Electronic portal

NAICS

332999

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Bid unit prices apply to actual quantities delivered, regardless of estimated quantities. The bid form includes line items for 60/140MM, 76/160MM, 114/225MM, 140/250MM, 168/280MM, and 273/450MM pipe; various fittings; pre-insulated ball valves; joint kits (split sleeve and welded); end caps; insulation joint fusing machine rental; expansion foam pads; installer training; and shipping, customs, and delivery.

Key dates

Questions due
Dec 3, 2026, 4:00 PM Central Time
Bids due
Dec 8, 2026, 2:00 PM CT

Documents

  • 26-0599-bid-package.pdf13 pages
  • addendum-1-to-26-0599.pdf1 pages
  • addendum-2-to-26-0599.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar bids near Duluth

Closing soon near Duluth