OpenRFQCloses Dec 18, 2026

HUR CR 0051 00.21 (GMTL) - Consultant services: Project consists of the 2'-0" Widening per side of Greenwich Milan Town Line Road from Scranton Road...

Huron CountyOhio#118902

The project includes 2'-0'' widening per side to achieve a 24'-0'' pavement width, 2'-0'' aggregate shoulders, and approximately 4,400 feet of storm sewer work.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 18, 2026
Time stated in bid documents
Dec 18, 2026, 4:00 PM Eastern Time
Submission
email
Documents analyzed
1

Scope of work

  • 2'-0'' widening per side of Greenwich Milan Town Line Road to achieve 24'-0'' pavement width
  • Relocation of roadside ditches
  • Material testing services

Steps to Bid

  1. 1

    Format the LOI with a minimum 12-point font, 1-inch margins, and centered page numbers.

  2. 2

    Submit the LOI electronically to Mike Farrell, P.E., P.S., at [email available with Pro] by 4:00 PM Eastern Time on December 18, 2026. by Dec 18, 2026, 4:00 PM

What you'll need

Submission

Email

NAICS

541330, 541370

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Estimated construction cost: $1,630,000.00. The LOI must be submitted electronically, not exceeding 12 pages (including two pages for the Project Approach), with a minimum 12-point font, 1-inch margins, and centered page numbers. The Department’s Specifications for Consulting Services 2026 Edition will apply to all agreements.

Key dates

Bids due
Dec 18, 2026

Documents

  • HUR-CR0051-00.21.pdf23 pages

See all documents · Download with Pro

More from this agency

Similar bids in Ohio

Closing soon in Ohio