OpenRFPCloses Dec 8, 2026

HVAC Renovation Phase 4 – Building S – Design Build Services for Selective HVAC Renovation and Controls Upgrades

Cape Fear Community CollegeNorth Carolina#83-CFCC2026-1103

Cape Fear Community College is soliciting Design Build proposals for HVAC renovations and controls upgrades in Building S, Downtown Campus, Wilmington, NC. The scope includes replacing VAVs, hot water coils, and control dampers on Floor #2, replacing DDC controls on ground floor AHUs, installing DDC controls, hot water piping, grilles, dampers, actuators, fire dampers, upgrading AHUs to VFDs, installing extended outdoor boiler flues, and replacing ceiling grid and tile. The project is budgeted at $850,000, funded by New Hanover County Capital Improvement Funds. E-mail and fax are not accepted. Responding firms must be licensed in North Carolina to practice engineering, architecture, or landscape architecture.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 8, 2026
Time stated in bid documents
Dec 8, 2026, 3:00 PM Eastern Time
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
3 items · full checklist with Pro

Scope of work

  • Upgrade AHUs from starters to VFDs
  • Remove and replace ceiling grid and tile

Steps to Bid

  1. 1

    Ensure your firm is licensed in North Carolina to practice engineering, architecture, or landscape architecture.

  2. 2

    Submit the package via FedEx or UPS to the physical address: Cape Fear Community College, Attn: David Kanoy, 411 North Front Street, Wilmington, NC 28401. by Dec 8, 2026, 3:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

238290, 541330

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves selective renovation of Floor #2, including replacement of VAVs, hot water coils, and control dampers on the existing dual deck or multizone HVAC system. Scope includes DDC controls, hot water piping from building riser to VAVs, grilles, outside air dampers and actuators, fire dampers, and other required accessories. Air handlers will be upgraded from starters to VFDs. Associated removal and replacement of ceiling grid and tile are required. One firm will be selected to perform the entire project. The building is 7 floors, 114,000 square feet.

Key dates

Bids due
Dec 8, 2026

Documents

  • 11-3_Advertisement_for_CFCC_Bldg_S_HVAC_Renovations_Phase_4_Design_Build_sol.pdf2 pages

See all documents · Download with Pro

Similar bids in North Carolina

Closing soon in North Carolina