I-15; South Cedar Interchange & Widening
Utah Department of Transportation — UDOTIron, Utah#F-I15-2(94)56
The project includes full reconstruction of the interchange, widening of I-15, and associated roadway, drainage, utility, structural, landscaping, signing, lighting, and ITS work. Prequalification is required. The Department will not hold retention. The scope includes removal of existing structures, excavation, earthwork, and installation of new drainage, pavement, barriers, retaining walls, noise walls, traffic signals, ITS conduits, and lighting. The project includes 144,629 cubic yards of roadway excavation, 62,420 cubic yards of granular borrow, 69,657 tons of HMHMA asphalt, 5,555 linear feet of 42-inch constant slope half barrier, 2,139 linear feet of 54-inch stepped median barrier, 1,355 linear feet of CAT 6 cable, 2,850 feet of 144-strand SMFO cable, and 324 fusion splices.
On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 9, 2026
- Submission
- electronic portal
- Contract term
- To be determined by competitive bidding
- Documents analyzed
- 8 published · 4 analyzed
Scope of work
- Upgrade existing interchange on I-15 at Exit 57
- Widen I-15 between MP 56.00 and MP 58.00
- Remove existing bridges, retaining walls, fences, and signs
- Excavate 144,629 cubic yards of roadway material
Steps to Bid
- 1
Register with UDOT and complete the prequalification application.
- 2
Download the project documents (Plans, Specifications, Addenda) from UDOT's Project Development Construction Bid Opening Information website.
What you'll need
Prequalification
RequiredContract duration
To be determined by competitive bidding
Submission
Electronic portal
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project is a P+T (Price + Time) contract with an estimated value between $60M and $80M. Prequalification is required. The bid opening is scheduled for 2:00 p.m. on November 24, 2026, at the UDOT Salt Lake City main office.
Key dates
- Questions due
- Nov 17, 2026, 2:00 PM Mountain Time
- Bids due
- Dec 9, 2026
Documents
- F-I15-2_94_56_Adv_Set.pdf
- F-I15-2_94_56_NTC.pdf3 pages
- project-files
- F-I15-2_94_56_items.pdf12 pages
- F-I15-2_94_56_Ad1.pdf32 pages
- addendum
- F-I15-2_94_56_Ad3.pdf4 pages
- F-I15-2_94_56_Ad4.pdf19 pages
More from this agency
- UDOT Region 1 Saleratus Creek Mitigation Site · closes Dec 1, 2026
- I-15; MP 202-284, Wrong-way Driving Improvements · closes Dec 18, 2026
- Springville 2900 E / Canyon Road Trailhead Trail and Site Improvements · closes Dec 18, 2026
- SR-39; 4700 W. to Weber River Widening — Widen Existing Facility in Weber County, Utah · closes Jan 6, 2027
- MVC; Porter Rockwell to Old Bingham Construction Project · closes Feb 19, 2027
Closing soon near Iron County
- RFP for Airport Planning Services for the Milford Municipal Airport · Milford · closes Dec 1, 2026
- RFP for Airport Engineering Services for the Milford Municipal Airport · Milford · closes Dec 1, 2026