OpenConstructionCloses Jan 6, 2027

I-5 Columbia River Bridge Pre-Completion Tolling Project

Washington State DOT — WSDOTClark County, Washington#XE3786

The Washington State Department of Transportation is seeking bids for the I-5 Columbia River Bridge Pre-Completion Tolling Project in Clark County, WA. The work includes construction and installation of tolling infrastructure on the I-5 Columbia River Bridge. The project is managed by Project Engineer Dominique Huffman.

On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 6, 2027
Time stated in bid documents
Jan 6, 2027, 11:00 AM Pacific Time
Submission
electronic portal

Scope of work

  • Install toll collection systems on I-5 Columbia River Bridge
  • Construct traffic control and signage infrastructure
  • Complete civil and electrical work for tolling operations
  • Coordinate with WSDOT for system integration and testing

Steps to Bid

  1. 1

    Register with WSDOT's eProcurement system or obtain the solicitation package from the WSDOT website.

What you'll need

Submission

Electronic portal

NAICS

237130, 237199

How to submit

Submit via the WSDOT eProcurement portal. All documents must be uploaded in the required format and submitted by the deadline.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves the design, construction, and implementation of tolling infrastructure on the I-5 Columbia River Bridge prior to full completion of the bridge. The solicitation is currently advertised and open for bid submission.

Key dates

Bids due
Jan 6, 2027

More from this agency

Similar bids in Washington

Closing soon in Washington