Ag and Event Center Lighting Project

County of UnionNorth Carolina#377-IFB 2027-013A

Union County is soliciting bids for the installation of 24 new streetlights along Cultivation Circle from Presson Road to the Simpson Events Center at 307 Cultivation Drive, Monroe, NC 28112. The scope includes all construction and electrical work associated with lighting fixture installation. Bids must be submitted on a lump sum basis by December 17, 2026, at 10:00 AM local time. A non-mandatory pre-bid meeting is scheduled for November 23, 2026, at 2:00 PM at the Simpson Events Center. The work must be completed within 240 calendar days of the Notice to Proceed. Liquidated damages of $250 per day apply for delays.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 10:00 AM Eastern Time
Submission
mail, hand delivery
Contract term
240 calendar days
Documents analyzed
1

Scope of work

  • Erect lighting poles and mount fixtures
  • Install underground conduits and wiring
  • Connect to electrical grid and test

Steps to Bid

  1. 1

    Register with Duncan-Parnell to obtain the Bidding Documents from Official linkPro.

  2. 2

    Review the Bidding Documents, including the Invitation to Bid, Instructions to Bidders, and all drawings and specifications.

  3. 3

    Attend the non-mandatory pre-bid meeting on November 23, 2026, at 2:00 PM at the Simpson Events Center, 307 Cultivation Drive, Monroe, NC 28112. by Nov 23, 2026, 2:00 PM

  4. 4

    Submit any questions in writing to Kyle Hodge at [email available with Pro] by 5:00 PM local time on December 4, 2026. by Dec 4, 2026, 5:00 PM

  5. 5

    Deliver the bid to Union County Procurement and Contract Management at 610 Patton Avenue, Monroe, NC 28110, by 10:00 AM on December 17, 2026. by Dec 17, 2026, 10:00 AM

What you'll need

Contract duration

240 calendar days from the Notice to Proceed

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope includes all construction associated with coordinating and erecting lighting fixtures, and all electrical services related to them. Work includes site preparation, pole installation, conduit and wiring, fixture mounting, and connection to the electrical grid. The bid must be delivered to Union County Procurement and Contract Management at 610 Patton Avenue, Monroe, NC 28110. The Owner reserves the right to reject any or all bids.

Key dates

Pre-bid meeting
Nov 23, 2026, 2:00 PM Eastern Time
Bids due
Dec 17, 2026

Documents

  • IFB_2027-013_Ag_Event_Center_Lighting_Project.pdf31 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby