PFD - City Hall Four Stop Elevator Construction
City of Boston — PFD01 - Public Facilities DepartmentMassachusetts#BD-27-1142-PFD01-PFD01-135461
The City of Boston is soliciting sealed bids for the construction of a new four-stop elevator at Boston City Hall, including removal of existing escalators. The project is located at 1 City Hall Square, Boston, MA 02201. Bids are due by 12:00 PM on January 27, 2027, for general contractors and January 12, 2027, for sub-bid trades. A 5% bid bond is required. The successful bidder must provide a 100% performance and payment bond. Prevailing wages apply. A pre-bid meeting is scheduled for December 14, 2026, at 11:00 AM. Questions must be submitted by December 18, 2026, at 12:00 PM. Electronic bids are accepted via the Trimble Unity Construct portal. The project duration is 502 days.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 27, 2027
- Time stated in bid documents
- Jan 27, 2027, 12:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery, electronic portal
- Documents analyzed
- 1
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Construct new four-stop elevator from ground level to level 04 at Boston City Hall
- Remove existing escalators
- Comply with prevailing wage requirements
- Submit 5% bid bond and DCAMM documentation
Steps to Bid
- 1
Review the full bid documents, including plans and specifications, available electronically upon request to [email available with Pro]. was Nov 23, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 2
Attend the pre-bid meeting on December 14, 2026, at 11:00 AM at Boston City Hall, 1 City Hall Square, Boston, MA 02201. Attendance is mandatory. by Dec 14, 2026, 11:00 AM
- 3
Submit all questions by December 18, 2026, at 12:00 PM, in writing to [email available with Pro]. by Dec 18, 2026, 12:00 PM
- 4
Submit the bid via the Trimble Unity Construct (formerly e-Builder) online portal or in person at the PFD Bid Box, 26 Court St, 1st Floor, Boston, MA 02108. by Jan 27, 2027, 12:00 PM
What you'll need
Contract duration
502 calendar days from notice to proceed
Submission
Mail, Hand delivery, Electronic portal
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The City of Boston, acting through its Public Facilities Commission and the Public Facilities Department (PFD), invites sealed bids for the construction of a new four-stop elevator at Boston City Hall, from ground level to level 04. The scope includes removal of existing escalators and full construction of the new elevator system. The successful bidder must provide a performance bond and labor and materials payment bond in the amount of 100% of the contract price. Bidders may submit questions by December 18, 2026, at 12:00 PM, via email to [email available with Pro]. Electronic bids are accepted through the Trimble Unity Construct (formerly e-Builder) portal at [link available with Pro]. The expected contract duration is 502 days. Sub-bid trades include: Electrical Work, Elevators, Fire Protection Sprinkler Systems, Glass and Glazing, HVAC, Masonry Work, Miscellaneous and Ornamental Iron, Plumbing, and Terrazzo.
Key dates
- Pre-bid meeting
- Dec 14, 2026, 11:00 AM Eastern Time
- Bids due
- Jan 27, 2027
Documents
- ADV_for_PFD_Project_No_7307_Stop_Elevator_Construction.docx
More from this agency
- 2027 Parks Operations and Management of Mobile Vending Carts · closes Dec 1, 2026
- Full Electric Cargo Van (PWD) · closes Dec 2, 2026
- Prequalified Contractors PFD – 201 Rivermoor Street Project No. 7253 PFD Bid Box Bid.info@boston.gov (617)-635-4809
- PFD - South End Branch Library
- PFD - City Hall Four Stop Elevator
Similar bids in Massachusetts
- Elevator Maintenance and Repairs On-Call · closes Jan 1, 2027
- Town Building Elevator Modernization · closes Dec 17, 2026
- EMG Elevator Upgrade · closes Dec 15, 2026
- Elevator #1 Modernization · closes Dec 29, 2026
- Construction of New Four Stop Elevator at Boston City Hall · closes Jan 12, 2027
Closing soon in Massachusetts
- Line Truck Lift Equipment Inspection, Preventative Maintenance and Repair Service · closes Dec 2, 2026
- HVAC Preventative Maintenance and Repairs · closes Dec 2, 2026
- Alford Street Facility Seawall Repair · closes Dec 2, 2026
- Utility Billing Services - Request for Proposals · closes Dec 3, 2026
- Ice Machine Disinfection Maintenance Agreement with 4 (1-year option periods) · closes Dec 3, 2026