ClosedRFQClosed Nov 19, 2026, 12:00 PM CT

IL 53 (Ruby St) at Des Plaines River, Phase I/II Bridge Rehabilitation Project

Illinois Department of Transportation — IDOT Bureau of Design and Environment - Consultant ServicesIllinois#D-91-075-26

The estimated construction cost is $35,000,000. Firms must be prequalified in Highways (Roads and Streets) and Structures (Highway: Movable). The DBE goal is 5%.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidEmail — included with ProPro

Overview

Due
Nov 19, 2026, 12:00 PM CT
Time stated in bid documents
Nov 19, 2026, 12:00 PM Central Time
Submission
electronic portal
Documents analyzed
1

Scope of work

  • Rehabilitation of bridge S.N. 099-9901 carrying IL 53 (Ruby Street) over the Des Plaines River.
  • Includes structural steel repairs, deck replacement, mechanical system analysis, bridge rebalancing, repainting, substructure patching, counterweight pit cleani
  • Must ensure historic integrity of the bridge is not impacted.
  • Detours may be required.

Steps to Bid

What you'll need

Prequalification

Required

Contract duration

60 months after authorization to proceed

Submission

Electronic portal

How to submit

All interested firms must submit through the Engineering Prequalification and Agreement System (EPAS).

Get alerts for bids like this

New bridge bids in Illinois

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The contracting method is Cost Plus Fixed Fee (CPFF). Completion is 60 months after authorization to proceed. Prime firm prequalification categories required are Highways (Roads and Streets) and Structures (Highway: Movable).

Documents

  • ptb-222r.pdf170 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby