OpenIFBCloses Dec 1, 2026

Installing Ungulate-Proof Fence on Oʻahu – North Hālawa

Land & Natural Resources — Forestry and WildlifeOahu, Hawaii#B27000688

The successful bidder will enter into a contract with the State using a Purchase Order (PO). The State will supply fence panels, t-posts, hog rings, and smooth wire. The Contractor is responsible for labor, transportation, site preparation, and all tools, equipment, and supplies not provided by the State. Access is primarily by helicopter to the Waimano Water Tank LZ or via the Aiea Loop Trailhead. The Contractor must provide a performance bond and a payment bond for each PO. The project is in the Koʻolau Mountains at 1,500–2,500 feet elevation, with high rainfall (236–275 inches/year), and includes sensitive native species and endangered wildlife. The Contractor must avoid rare plants (marked in pink and blue), the ʻelepaio bird (breeding season: January–July), and the Hawaiian Hoary Bat (pupping season: June 1–September 15). Vegetation clearing must be done by hand with tools, not exceeding 7 feet in width. All gear must be cleaned with 70% isopropyl alcohol and boots sprayed with 70% alcohol before and after site entry. No use of tools or gear from Hawaiʻi or Kauaʻi on Oʻahu. The contract term is 18 months from the Notice to Proceed, with up to three one-year extensions. The Contractor must also comply with HRS Chapter 104, Davis-Bacon wage rates, and provide weekly certified payroll. The Contractor must also submit a certificate of compliance from DLIR, a certificate of good standing from DCCA, and a tax clearance from DOTAX and IRS. The Contractor must not use subcontractors without prior written approval and must submit subcontract

On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 1, 2026
Bid bond
100%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Contract term
18 months from the Notice to Proceed + Three one-year extensions may be possible
Documents analyzed
7 published · 2 analyzed

Scope of work

  • Install remote ungulate panel fence in Hālawa area, Oʻahu
  • Construct fence using hot-dipped galvanized panels and t-posts
  • Transport materials and crew by helicopter to Waimano Water Tank LZ

Steps to Bid

  1. 1

    Register for the voluntary pre-bid conference via the online procurement system website by 1:00 PM on November 9, 2026. was Nov 9, 2026, 1:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Submit written inquiries to [email available with Pro] at least 14 days before the bid opening. was Nov 16, 2026

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Upload the bid and all required documents to the State’s electronic bid site before the due date and time. by Nov 30, 2026, 2:00 PM

What you'll need

Contract duration

18 months from the Notice to Proceed

Submission

Electronic portal

NAICS

238290

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Contractor must not engage in discrimination, conflicts of interest, or campaign contributions. The Contractor must not disclose confidential information. The Contractor must not perform work on weekends, holidays, or at night without written approval. The Contractor must not store materials or equipment at the Waimano Baseyard. The Contractor must remove all waste and litter from the site. The Contractor must not use the DOFAW baseyard as an office or staging area. The Contractor must not use the DOFAW baseyard for overnight parking. The Contractor must not use the DOFAW baseyard for storage. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW baseyard for storage of tools, supplies, equipment, or other materials. The Contractor must not use the DOFAW baseyard for overnight vehicle parking. The Contractor must not use the DOFAW,

Key dates

Pre-bid meeting
Nov 9, 2026, 12:00 PM Hawaii Time
Bids due
Dec 1, 2026

Documents

  • Halawa_Fence_Contract_IFB_Aug_2026.pdf26 pages
  • AG-008_103D_General_Conditions_1.10.23_.pdf16 pages
  • public-display-solicitation.html
  • Halawa_Fence_Contract_IFB_Aug_2026.pdf26 pages
  • solicitation-notice.html
  • Halawa Fence Contract IFB Aug 2026.pdf
  • AG-008 103D General Conditions (1.10.23).pdf

See all documents · Download with Pro

More from this agency

Similar bids in Hawaii

Closing soon in Hawaii