Intersection Improvement, Roundabout at Keller Hill Road, 1.51 Miles North of SR 42, Hendricks County, Indiana

Indiana DOT — INDOTHendricks, Indiana#R-44389

Construction of a roundabout at SR 39 and Keller Hill Road in Hendricks County, Indiana. Scope includes earthwork, subgrade treatment, aggregate base, HMA paving, concrete curbs and sidewalks, stormwater drainage with underdrains and culverts, traffic control devices, temporary signage, and lighting. The project is in the Crawfordsville District. The engineer's estimate is $3,051,477.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Mar 10, 2027
Time stated in bid documents
Mar 10, 2027, 11:59 PM Eastern Time
Submission
electronic portal
Contract term
3 years + Two additional one-year renewal terms
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Remove existing guardrail (794 LFT)
  • Excavate 9,000 CYS of earth
  • Install 11,867 SYS of geotextile for pavement
  • Pave with HMA: 1,093 TON surface, 1,367 TON intermediate, 3,864 TON base
  • Install 395 SYS of 9 in. PCCP and 655 SYS of 4 in. PCCP

Steps to Bid

  1. 1

    Register with INDOT's eProcurement system (if not already registered)

  2. 2

    Review the full bid package, including Stage 2 Quantity Calculations and plans.

  3. 3

    Submit questions to the INDOT project engineer by March 3, 2027, at 11:59 PM ET. by Mar 3, 2027, 11:59 PM

  4. 4

    Attend the pre-bid meeting on February 24, 2027, at 10:00 AM ET (virtual via Zoom). Attendance is mandatory. by Feb 24, 2027, 10:00 AM

What you'll need

Submission

Electronic portal

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

53: 1,264 CYS and 846 TON), milling of existing asphalt (226 SYS), and paving with HMA (Surface: 1,093 TON, Intermediate: 1,367 TON, Base: 3,864 TON, OG Intermediate: 1,721 TON). Concrete work includes curb and gutter (970 LFT, Type B Modified: 36 LFT, Type C Modified: 55 LFT), concrete sidewalks (45 SYS), and PCCP (9 in. stained red: 395 SYS, 4 in. stained red: 655 SYS). Stormwater management includes underdrains (Type 2: 80 LFT, Type 3: 188 LFT, Type 4: 2,115 LFT), cleanout ports (4 EACH), and outlet protectors (6 EACH). Traffic control includes temporary pavement markings (13,122 LFT, 700 LFT, 48 LFT), temporary barriers (1,210 LFT), barricades (144 LFT Type III-A, 62 LFT Type III-B), and construction signs (26 Type A, 10 Type B). Lighting and electrical work includes 8 lighting poles (40 ft E.M.H., breakaway base), 8 luminaires, 8 conduit runs (2 in. galvanized steel), and 1 service point. Right-of-way markers (22 EACH), monuments (Type B: 3 EACH, Type C: 1 EACH), and mailbox resets (2 EACH) are included. Field office (Type C: 9 MOS), riprap (257 TON), and sodding (1,296 SYS) are also part of the scope. The contract number is R-44389.

Key dates

Pre-bid meeting
Feb 24, 2027, 10:00 AM Eastern Time
Bids due
Mar 10, 2027

Documents

  • STG2_QtyCalcs_2200084_for_Roadway_Services.pdf19 pages
  • STG2_PlansXsectPub_2200084_for_Roadway_Services.pdf