OpenConstructionCloses Dec 18, 2026, 11:00 AM CT

Intersection Realignment at Route K and N, Scott County

Missouri Department of Transportation — MoDOTMissouri#261218-H07

This project involves the realignment of the intersection at Route K and N in Scott County, Missouri, covering 0.046 miles. Bids are due electronically via Bid Express on December 18, 2026, at 11:00 AM local time. Contractors must be prequalified at least seven days prior to the bid opening. The contract is subject to prevailing wage laws and Buy America requirements. The estimated contract value is between $500K and $750K.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 18, 2026, 11:00 AM CT
Time stated in bid documents
Dec 18, 2026, 11:00 AM Central Time
Submission
electronic portal
Documents analyzed
6 published · 4 analyzed

Scope of work

  • Clearing, grubbing, excavation, and embankment.
  • Installation of aggregate base, concrete pavement, and guardrail.
  • Traffic control measures including temporary signals and rumble strips.
  • Pavement marking, erosion control, culvert, and seeding/mulching work.
  • Disassembly, transport, and disposal of existing signs.

Steps to Bid

  1. 1

    Submit completed Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening.

    See Secs 101-103 of the Missouri Standard Specifications for Highway Construction, and Rule 7 CSR 10-15.010.

  2. 2

    Submit bids electronically using "Bid Express Secure Internet Bidding" at Official linkPro. by Dec 18, 2026, 11:00 AM

    Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.

  3. 3

    Submit the Subcontractor Disclosure Form in accordance with the bidding documents. by Dec 21, 2026, 4:00 PM

    For bids of more than $2,000,000, each bidder shall submit with each bid a disclosure of the subcontracts that have a subcontract value that is equal or greater than twenty percent of the total project bid or subcontracts that are greater than or equal to $2,000,000. If that information is not available at the time of bid the bidder shall submit the "Subcontractor Disclosure Form" pages with MoDOT on or before 4:00 p.m. of the third business day after the bid opening date.

  4. 4

    Submit the DBE Identification Submittal in accordance with the bidding documents for Federal Projects Only.

What you'll need

Prequalification

Required

Submission

Electronic portal

How to submit

All bids shall be submitted electronically using "Bid Express Secure Internet Bidding" at Official linkPro. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.

In person/mail: Missouri Highways and Transportation Commission, Attention: State Design Engineer/Bid Bond, P.O. Box 270, Jefferson City, MO 65102

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

This project involves roadway construction including clearing and grubbing, removal of improvements, excavation, embankment, grading, aggregate base, concrete pavement, rock blanket, traffic control devices (changeable message signs, rumble strips, temporary traffic signals), pavement marking, erosion control, concrete culverts, reinforcing steel, pipe installation, seeding and mulching, guardrail, and signing. The project also includes provisions for price adjustments for fuel and asphalt cement, combination bids, certifications for federal and state jobs, antidiscrimination, preference to Missouri firms, subcontractor disclosure, and bid guaranty. The contract is subject to prevailing wage requirements and Buy America requirements for iron and steel products. A Water Pollution Control Manager (WPCM) is required for projects with land disturbance of one acre or more. The contract is federally funded.

Key dates

Bids due
Dec 18, 2026, 11:00 AM CT

Documents

  • 261218_H07_JSE0143_Bid_Book.pdf15 pages
  • 261218_H07_JSE0143_JSP_Roadway.pdf41 pages
  • 261218_H07_JSE0143_Plans_S.pdf
  • 261218_H07_JSE0143_X_Sections_S.pdf
  • 261120_Notice_To_Contractors_B04_H02_H07.pdf4 pages
  • 261218_Notice_To_Contractors.pdf8 pages

See all documents · Download with Pro

More from this agency

Similar bids in Missouri