OpenIFBCloses Dec 17, 2026

Invasive Plant Management

Town of Ridgefield, CTRidgefield, Connecticut#27-07

Spot herbicide treatments are required in mid-to-late summer and late spring of the following year. Bids must be submitted via email by December 17, 2026, at 11:00 AM EDT. The Town may award phases separately.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 11:00 AM Eastern Time
Submission
email
Documents analyzed
1

Scope of work

  • Install 1,800 linear feet of 96-inch high deer fencing with three upper wire lines (total height over 10 feet)
  • Establish and restore temporary equipment landing area at access point
  • Perform spot herbicide treatment on re-emergent growth in mid-to-late summer and late spring of next year
  • Provide three project references from the past 10 years in invasive species management

Steps to Bid

  1. 1

    Schedule a site walk-through with Roberta Barbieri ([email available with Pro] or 203-273-6142) by Dec 3, 2026

  2. 2

    Submit questions in writing to David McFate at [email available with Pro] by December 3, 2026, at 11:00 AM by Dec 3, 2026, 11:00 AM

  3. 3

    Prepare and submit a complete bid package via email to [email available with Pro] by December 17, 2026, at 11:00 AM EDT by Dec 17, 2026, 11:00 AM

What you'll need

Submission

Email

NAICS

561720

How to submit

Submit via email to [email available with Pro]. Subject line: '27-07 (Company Name) Bid Package'. All required documents must be included in one email attachment or as separate attachments in a single email.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 7 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Key dates

Questions due
Dec 3, 2026, 11:00 AM Eastern Time
Bids due
Dec 17, 2026

Documents

  • 27-07_FWR_Invasive_Plant_Management_2_.pdf21 pages

See all documents · Download with Pro

Similar bids near Ridgefield

Closing soon near Ridgefield