OpenIFBCloses Dec 16, 2026

Invitation for Bids Taxiway A and Taxiways A2 and A3 Rehabilitation

Jackson Hole AirportJackson, Wyoming

Work includes pavement removal, subbase and base course reconstruction, asphalt surfacing, drainage installation, electrical systems, and environmental restoration. The project is divided into five schedules and involves over 50 line items, including 33,175 SY of 9-inch pavement removal, 34,695 SY of FDR recycled base, 13,250 tons of PG 64-34 asphalt, and 9,599 LF of 12-inch slotted drain. Bidders must be on the Planholder’s List to receive updates and must attend the mandatory pre-bid conference. A 5% bid bond is required. The successful bidder must provide 100% performance and payment bonds.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidPhone — included with ProPro

Overview

Due
Dec 16, 2026
Time stated in bid documents
Dec 16, 2026, 2:00 PM Mountain Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
5 items · full checklist with Pro

Scope of work

  • Rehabilitate Taxiway A and Taxiways A2 and A3
  • Remove 33,175 SY of 9-inch pavement on Taxiway A
  • Construct 10 EA 60-inch diameter manholes

Steps to Bid

  1. 1

    Register as a Planholder on Official linkPro to access the full bid documents and receive automatic updates on addenda.

  2. 2

    Attend the mandatory pre-bid conference on December 3, 2026, at 12:00 p.m. (local time), in person or via Microsoft Teams. by Dec 3, 2026, 12:00 PM

What you'll need

Contract duration

45 calendar days for 2027 work, 120 calendar days for 2028 work

Submission

Mail, Hand delivery

NAICS

237130, 237199, 237999

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
  • The 5-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project includes full and partial depth pavement removal, subbase and base course reconstruction, asphalt surfacing, drainage system installation (including 12-, 18-, 24-inch PVC and polypropylene pipes, storm boxes, manholes, underdrains, and trench drains), electrical work (installation of taxiway edge lights, guidance signs, and grounding systems), and environmental restoration. Work will be performed in five schedules: (I) South of Taxiway A2, GA Island, turnaround pad, and partial A3 reconstruction; (II) A2 to A3 and partial A2 reconstruction; (III) A2 within Runway Safety Area; (IV) A3 within Runway Safety Area; and (V) relocation of a vehicle service road outside the Taxiway A Object Free Area. Major quantities include 33,175 square yards of 9-inch partial depth pavement removal on Taxiway A, 34,695 square yards of FDR recycled asphalt base, 13,250 tons of PG 64-34 asphalt surface course, 9,599 linear feet of 12-inch slotted drain, 10 EA 60-inch diameter manholes, 109 EA L-861T taxiway edge lights, and 10 EA L-858 LED guidance signs. 3-56-0014-090-2026 and WYDOT Project No. AJA029. Performance and payment bonds each at 100% of contract price. Work is to be completed in two phases: 2027 work within 45 calendar days, 2028 work within 120 calendar days.

Key dates

Pre-bid meeting
Dec 3, 2026, 12:00 PM Mountain Time
Bids due
Dec 16, 2026

Documents

  • JAC-TW-A-REHAB-NOTICE-TO-BIDDERS.pdf7 pages