Pre-Qualification Invitation for Stream Restoration and Sanitary Sewer Bypass Pumping System at Dead Run, Georgetown Pike, Fairfax County, VA
County of FairfaxFairfax County, Virginia#000031
The County of Fairfax is seeking pre-qualified contractors for a stream restoration and sanitary sewer bypass pumping system project at Dead Run, Georgetown Pike, Fairfax County, VA. The scope includes 5,916 linear feet of natural channel stream restoration, riparian corridor enhancement, invasive species removal, and native vegetation replacement. A 2,600 GPM sanitary sewer force main bypass pumping system must be installed and operated continuously during construction, with pre- and post-construction CCTV inspections. Contractors must have demonstrated experience in environmental restoration, pumping systems, and pipeline inspection. The pre-qualification application is due by December 4, 2026, at 4:30 PM ET.
On PublicBidSearch: the original bid posting and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 4:30 PM Eastern Time
- Submission
- online portal
Scope of work
- Restore 5,916 linear feet of stream using natural channel design
- Enhance riparian corridor with native trees, shrubs, and herbaceous plants
- Remove invasive plant species
Steps to Bid
- 1
Review the pre-qualification invitation and scope of work.
- 2
Prepare and submit a pre-qualification application by the due date. by Dec 4, 2026, 4:30 PM
- 3
Ensure all required documentation (e.g., licenses, insurance, past project references) is included with the application. by Dec 4, 2026, 4:30 PM
What you'll need
Prequalification
RequiredSubmission
Online portal
How to submit
Submit pre-qualification application via the County of Fairfax vendor portal at Official linkPro
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project also requires the design, installation, and operation of a sanitary sewer force main bypass pumping system capable of handling flows up to 2,600 gallons per minute, operating continuously 24 hours a day during construction. Bidders must demonstrate experience and capability in environmental restoration, hydraulic pumping systems, and pipeline inspection.
Key dates
- Bids due
- Dec 4, 2026
More from this agency
- Shrevewood Elementary School Safe Routes to School: Construction of Asphalt Walkway, Shared Use Path, Sidewalk, Curb… · closes Dec 7, 2026
- Chesterbrook Road Walkway Phase 2 – Little Pimmit Run Tributary · closes Dec 16, 2026
- RFP-Fort Willard Historic Site-Interactive Interpretative Signage · closes Dec 17, 2026
- Construction of the Richmond Highway Bus Rapid Transit (BRT) Project · closes Dec 21, 2026
- West Annandale Volunteer Fire Station Construction · closes Jan 12, 2027
Similar bids in Virginia
- Water & Wastewater Treatment Chemicals — Invitation to Bid #450 · closes Dec 22, 2026
- Pump Station Maintenance · closes Dec 15, 2026
- Hoof and Claw Wastewater Pump Station Upgrade · closes Jan 7, 2027
- JCSA Lift Station 9-9 Grating Replacement · closes Dec 17, 2026
- Westwood Sewer Improvements Phase 1 Force Main and Dabney Road Gravity Sewer · closes Dec 17, 2026
Closing soon in Virginia
- Duct Assembly, Air Conditioning · closes Nov 23, 2026
- Janitorial Services for Mounds Restroom and Picnic Pond at St. Marks National Wildlife Refuge · closes Nov 25, 2026
- Procurement of Machine Thread Plug, NSN 5365012206683 · closes Nov 27, 2026
- Cover Assembly, Pump (NSN 1610007079745) – 37 Units · closes Nov 27, 2026
- Wiring Harness, Branch · closes Nov 27, 2026